Instruction Manual: Hot Tub
27
https://holzklusiv.de/montage1
Please follow the steps below to assemble the flue pipe:
1.
Remove the parts stored securely in the stove and in the tub.
The following parts must be
included in the scope of delivery of the hot tub (see following
Figure 14
):
Figure 14: Scope of delivery for the flue pipe
2.
Be sure to remove all protective films from the pipe parts before assembling it.
3.
Note the numbers on the two pieces of pipe. The designs for the two pipe sections are
not identical. The pipe piece with the number 1 is the lower piece, the one with the
number 2 is the upper piece.
Heat shield
Pipe no. 2 (upper
pipe)
Pipe no. 1 (lower
pipe)
Connecting clamp
Corner piece
Rain cover