![HOLL'S Hybrid Combi HL-HC04-RS Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/holls/hybrid-combi-hl-hc04-rs/hybrid-combi-hl-hc04-rs_installation-handbook_2145314069.webp)
78
DE
INFORMATION
General explanations on the operation of the Harvia stove:
The temperature rise in the sauna is done in stages. A booth takes on average 30 to
45 minutes to reach a temperature of 65-70 ° C. During this period, the lava stones
store heat.
To reach higher temperatures, it is necessary to add water to the stones. The steam
thus generated will allow a gradual and measured increase in temperature.
Ignition and delayed start:
Zone A
operation from 1 to 4 hours
Zone B
Delayed departure from 0
to 8 a.m.
80-90°C
65-70°C
30-45
+5
+5
Min
Preheating
The stones store the heat
Gradual increase
The stones release the heat
Содержание Hybrid Combi HL-HC04-RS
Страница 2: ...2...
Страница 8: ...8 Assemblage tapes de l assemblage tape 1 tape 2 tape 3 60 5 4pc...
Страница 9: ...9 FR Assemblage tape 4 tape 5 tape 6 Hexagon screws 2PC 1 2 3 4 45 4 8pc 45 4 4pc 45 4 9pc 45 4 2pc...
Страница 22: ...73 Assemble instructions Assembly steps Step 1 1 2 3 Step 2 Step 3 4 1 4 2 5 x 50 6 x 5...
Страница 36: ...73 Ensamblaje Etapas del montaje Etapa 1 Etapa 2 Etapa 3 1 2 3 4 1 4 2 5 x 50 6 x 5...
Страница 37: ...74 ES Ensamblaje Etapa 4 Etapa 5 Etapa 6 4 x 35 2 x Connect floor heater cable 5 x 50 4 x 6 7 4 x 40 4 x...
Страница 50: ...73 Assemblaggio Fasi di assemblaggio Fase 1 1 2 3 Fase 2 Fase 3 4 1 4 2 5 x 50 6 x 5...
Страница 51: ...74 IT Assemblaggio Fase 4 Fase 5 4 x 35 2 x Connect floor heater cable 5 x 50 4 x 6 7 4 x 40 4 x...
Страница 64: ...73 Montage Montageschritte Schritt 1 Schritt 2 Schritt 3 1 2 3 4 1 4 2 5 x 50 6 x 5...
Страница 65: ...74 DE Montage Schritt 4 Schritt 5 Schritt 6 4 x 35 2 x Connect floor heater cable 5 x 50 4 x 6 7 4 x 40 4 x...
Страница 75: ...70...
Страница 76: ...71...
Страница 77: ...72...