
28
HOW TO “RIG” YOUR CYLINDERS
1. Right side cylinder
2. Elastic tank bungee
3. 7 ft. low pressure hose w/bolt snap, connected to primary 2nd stage
4. 30 in. low pressure hose w/regulator necklace, connected to alternate 2nd stage.
5. Left side cylinder
6. Brass SPG w/ 6” HP hose
7. 2nd stage (212 adjustable unit shown)
8. Alternate low pressure quick disconnect hose – for drysuit inflation if needed
9. Primary low pressure quick disconnect hose 15’ – for LP inflator
10. First Stage – DIN (DC1 unit shown)
1
2
3
4
5
7
6
10
9
8