Holland Electric HEP V2 Скачать руководство пользователя страница 20

20 

6. OPERATION

6.1. Power on

After the charging station has been installed and confirmed, switch on the power supply. The "POWER" 
indicator light lights up and the charging station switches to standby state.

6.2. Human-Machine Interface

6.2.1. Overview

As shown in Fig. 6-1, the M3W & M3B series product is configured with multiple human-machine interfaces.

LED indicators

1

LCD

2

RFID reader

3

Emergency stop button

4

Charging connector

5

Empty connector socket

6

Fig. 6-1 HMI of AC EV Charging Station

Содержание HEP V2

Страница 1: ...Holland Electric HEP V2 User Manual AC EV Charging Station...

Страница 2: ...eral explanations of these type of equipment and the actual product may be inconsistent with this manual in detail Article Model 1 phase 3 SkW 7kW Case B 3 phase llkW 22kW Case B 1 phase 3 SkW 7kW Cas...

Страница 3: ...Specifications 4 4 Nameplate 5 INSTALLATION 5 1 Unpacking 5 1 1 Packing list 5 1 2 Inspection confirm 5 2 Prepare 5 3 Installation steps 6 OPERATION 6 1 Power on 6 2 Human Machine Interface 6 3 Config...

Страница 4: ...requency Liquid Crystal Display Light emitting Diode Radio Frequency Identification Central Management System Manages EVSE and has the information for authorizing users for using its EVSE Open Charge...

Страница 5: ...user that minor personal injury or material damage can result if the device is not operated as requested CAUTION Do not touch by hands in case of ESD Indicates the possible consequences of touching el...

Страница 6: ...ed 6 2 2 Environment Installation and wiring should be done by personnel with professional qualification otherwise hazardous electric shock may result Make sure input power supply is entirely disconne...

Страница 7: ...les is exposed If you find any pLease contact the supplier in time EV can only be charged with the engine o and stationary 7 2 4 Operation Accessory replacement must be done by qualified personnel thr...

Страница 8: ...Case B Connection of an EV to a supply network with a cable assemble detachable at both ends Fig 3 1 Schematic diagram of CASE B connection Charging mode Method for connection of an EV to the supply n...

Страница 9: ...he charging interface of M3B products meet IEC 62196 2 Type 2 socket without charging cable Fig 3 2 Schematic diagram of CASE C connection Case C Connection of an EV to a supply network utilizing a ca...

Страница 10: ...nother is a Type 1 or Type 2 femal plug to EV The charging connector of M3W products meet IEC 62196 2 Type 2 plug with charging cable M3W series products provide a Type 2 female plug with charging cab...

Страница 11: ...mensions of M3B M3W AC EV charging station provides a 4 3 inch LCD screen with the corresponding control metering and communication functions belongs to the special AC power supply device for EV The b...

Страница 12: ...allbox shell code Fig 4 3 Model definition of M3B M3W 4 3 1 Electrical specifications of M3B series Phase Number Model Number M3B116EN M3B132EN M3B316EN M3B332EN Rated Power 3 5kW 230V 7kW 230V 11kW 4...

Страница 13: ...se 3 Phase Note The tripping time of MCB 10ms 1500A short circuit current Charging interface 4 3 2 Functional description Charging Mode Mode 3 Display Screen 4 3 inch LCD screen display charging curre...

Страница 14: ...te identifying the model and specification of the charging station As the Fig 4 4 shown taking M3W316EN as an example the location and content of the nameplate are illustrated 4 3 5 Mechanical paremet...

Страница 15: ...onsistent with the order requirements When transporting or moving the charging station pay attention to the following points to ensure product safety 1 If any damage or missing parts are found please...

Страница 16: ...r cable Space requirement When the charging station is fixed on the wall the minimum space requirements are shown in Fig 5 1 IIt is suggested that the charging station should be installed in a place w...

Страница 17: ...e appropriate height spaced 130mm x 70mm apart and secure the mounting accessories to the wall with the expansion screw which contain in package Prepare the following tools at least before installing...

Страница 18: ...hown in Fig 5 4 peel o the insulation layer of the prepared cable with wire stripper then insert the copper conductor into the crimping area of ring tongue terminal and press the ring tongue terminal...

Страница 19: ...interface connect each cable to the input terminals according to the terminal label Reset the terminal cover after wiring the input power cable Note if you need the Ethernet to connect the CMS you can...

Страница 20: ...ts up and the charging station switches to standby state 6 2 Human Machine Interface 6 2 1 Overview As shown in Fig 6 1 the M3W M3B series product is configured with multiple human machine interfaces...

Страница 21: ...6 2 there are three areas to display icons or instructions with the specific meanings as follows In any state the Power indicator is twinkle indicating that the charging station is connected to the CM...

Страница 22: ...screen The emergency stop button is pressed Failure to start please follow the instructions on the screen Fault state please follow the instructions on the screen 1 2 3 4 5 O line or no network Connec...

Страница 23: ...g connector When the charging station is in standby state please plug the charging connector into the empty socket in order to protect the charging connector If the charging process fails or the equip...

Страница 24: ...ep your laptop in a state where it can connect to WiFi hotspots Within two minutes after power on the charging station provides a WiFi hotspot as the access entrance for parameter configuration Connec...

Страница 25: ...the page After it takes e ect the charging station can access Internet through your WiFi a Park your EV into place turn o and put the EV under braking b Pick o the charging connector form empty socke...

Страница 26: ...Display of LCD screen after plug in e For the mode of swipe card or scan QR code charging station follow the instructions on the LCD screen after charging connector plugin you can start charging proc...

Страница 27: ...t charging please download and install the WE E Charge APP Scan the QR code on the right to download the WE E Charge APP for Android phone Search WE E Charge in APP Store to install iOS version APP Th...

Страница 28: ...our RFID card again when Charging indicator turns o the charging process is end d For the mode of scan QR code charging station click the stop button on your APP the charging will stop e When the char...

Страница 29: ...arging connector and charging socket of EV Disconnect and reconnect the charging connector The E stop button has been pressed After troubleshooting rotary the button clockwise to reset Check whether t...

Страница 30: ...fast Fault code 23 Relay sticking The device is damaged and needs to be returned to the factory for repair Fault LED 2x slow 4x fast Fault code 24 RCD fault Charging station is not grounded input pow...

Страница 31: ...of the following situations Equipment failure caused by not following the user s manual Equipment damage caused by fire flood abnormal voltage etc Equipment damage caused by using the product for abn...

Страница 32: ...32 NOTE...

Отзывы: