HOLEMAKER HMPRO200A Скачать руководство пользователя страница 5

®

HMPRO200A OPERATOR’S MANUAL

www.holemaker.com

5

1.1 Application

The PRO 200-A ATEX is an air drilling machine designed to drill holes either with diameters 
of 75–200 mm (2.95–7.87") to a depth of up to 100 mm (4") using annular cutters or with 
diameters of 12–45 mm (0.47–1.77") to a depth of up to 100 mm (4") using twist drill bits. 
In addition, it is capable to change the rotation direction to allow direct tapping or tapping 
by using a tap chuck with axial compensation. The machine is ATEX II 2 G/D c IIC T6/T4 
certified to allow working in explosive environments.
 

Magnets allow the drilling machine to be fixed to ferromagnetic surfaces with a force 

that ensures operator safety and proper machine operation.

1.2 Technical Data

Pressure

6.5 bar (94 psi)

Air connection

G1/2’’ external thread

Power

3650 W

Air consumption

3500 l/min (125 CFM)

Spindle shank

MT5

Tool holder

31.75 mm Weldon (1-1/4’’)

Drilling diameter with annular cutter 75–200 mm (2.95–7.87’’)
Drilling diameter with twist drill bit   12–45 mm (0.47–1.77’’)
Maximum drilling depth

100 mm (4’’)

Maximum tap size

M48 (G1-3/4’’)

Holding force of the magnets 

(surface with the thickness of 22 

mm and roughness Ra = 1.25)

2 × 15 000 N

Stroke

400 mm (15.75’’)

Rotational speed under load

20 rpm (gear I)  80 rpm (gear II)

Minimum workpiece thickness

13 mm (0.5’’)

Minimum pipe diameter

950 mm (37.4’’)

Base plate adjustment range

0–44 mm (0–1.73’’) front-back

Noise level

More than 85 dB

Required ambient temperature

0–40°C (32–104°F)

Weight

130 kg (290 lbs)

Содержание HMPRO200A

Страница 1: ...MACHINE READS AND UNDERSTANDS ALL SAFETY AND OPERATING INSTRUCTIONS IN THIS MANUAL BEWARE OF ROTATING MACHINE PARTS LINE VOLTAGE PRESENT NEVER PLACE FINGERS NEAR CUTTING AREA OR MACHINE ARBOR HEARING...

Страница 2: ...t which shall be the buyer s sole and exclusive remedy for defective goods ITMS accepts no additional liability pursuant to this guarantee for the costs of travelling or transportation of the product...

Страница 3: ...elements CONTENTS 1 GENERAL INFORMATION 4 1 1 Application 5 1 2 Technical data 5 1 3 Design 6 2 STARTUP AND OPERATION 7 2 1 Disassembling the machine into parts 7 2 2 Installing and removing the arbo...

Страница 4: ...ssive play on guide slides 8 Always wear safety goggles and ear protection 9 Do not remove metal chips with bare hands always use gloves 10 Do not touch the spindle and cutting tool during work 11 Cut...

Страница 5: ...ces with a force that ensures operator safety and proper machine operation 1 2 Technical Data Pressure 6 5 bar 94 psi Air connection G1 2 external thread Power 3650 W Air consumption 3500 l min 125 CF...

Страница 6: ...HMPRO200A OPERATOR S MANUAL 6 www holemaker com 1 3 Design K 1 4 6 2 4 8 4 1 1 4 B D...

Страница 7: ...emaker com 7 2 START UP AND OPERATION 2 1 Disassembling the machine into parts Disconnect two quick couplings 1 Fig 2 use the 6 mm hex wrench to unscrew the drive 2 and then use the 5 mm and 10 mm hex...

Страница 8: ...rbor twist drill bit screw tap chuck with axial compensation Next wear protective gloves and insert the arbor drill bit tap chuck into the spindle 2 Make sure that the vertical rod is not located betw...

Страница 9: ...HMPRO200A OPERATOR S MANUAL www holemaker com 9 4...

Страница 10: ...ctive gloves and then insert the proper pilot pin into the annular cutter 1 Fig 5 Use a clean and dry cloth to wipe the cutter Next place the cutter into the arbor 2 in such a way to align the flats 3...

Страница 11: ...he spring As a result after the cutter goes through the entire thickness the slug core is expelled from the cutter When pressed the pilot pin also allows application of coolant to the inner surface of...

Страница 12: ...g the screw tap Install the screw tap chuck with axial compensation as described before Next insert the entering tap tap no 1 into the proper adapter 1 Fig 8 and then install the adapter into the tap...

Страница 13: ...com 13 2 5 Preparing Before beginning clean steel parts including the MT5 shank from anti corrosion coating used to preserve the machine for storage and transport Then use the transport lug 1 Fig 9 to...

Страница 14: ...ast 20 mm 0 8 and 18 mm 0 7 for fittings The air source must be equipped with an air preparation unit a filter regulator and lubricator The flow capacity of the air preparation unit must not be less t...

Страница 15: ...12 drops of oil per minute Use only oil whose ignition temperature exceeds 260 C 500 F If the machine is to be left idle for at least 24 hours after the work is finished increase the delivery of oil...

Страница 16: ...e quality of drilled holes The clearance is inappropriate if the motor does not slide smoothly or if it raises without any action from the operator To adjust the clearance use the 13 mm combination wr...

Страница 17: ...o tapping tooling QUICK CHANGE CHUCK MASTER HOLDER Quick change chuck master holder for use on vertical drilling and boring machines with right and left hand spindle rotation Used with quick change ad...

Страница 18: ...M16 QASB3 M16 5 8 UNC UNF BSW 3 4 BSP 72 48 48 44 41 55 5 45 SPTH105 QASB3 M20 QASB3 M18 M20 3 4 UNC UNF BSW 72 48 48 44 41 55 5 45 SPTH105 QASB3 M22 QASB3 M22 7 8 UNC UNF BSW 1 2 BSP 72 48 48 44 41...

Страница 19: ...rbon Nitride Coated Made In U S A M2 High Speed Steel Multi Cut Geometry 12 to 32mm Metric 25mm 50mm Stainless Steel Cast Iron Super Cut M42 Cobalt M42 High Speed Steel 8 Cobalt Titanium Nitride Coate...

Отзывы: