![Hohner ORION 4 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/hohner/orion-4/orion-4_operating-instructions-spare-parts-list_2144675008.webp)
Hohner Maschinenbau GmbH – ORION 4
- 8 -
5.
Installation of the narrow stitching heads 70/20
Insert key blocks
1
into the traverses
2
. Milled part must point downwards.
Install the stitching head with the boring over the peg of the key blocks
1
, at the
same time also align the driving block
3
, the pusher
4
and adjusting block
5
with
the corresponding rails. Clamp the stitching head to the machine by turning down the
hex sockets
6
of the eccentric until it is tight.