Models EELR739A and EELR740A
Models EELR5741A and EELR742A
Installation, Operation and Maintenance
Page
4
Rev. 12/03/2019
15-18000-IOM-X.doc
R
ECEIVING
The shipment should be thoroughly inspected as
soon as it is received. The signed bill of lading is
acknowledgement by the carrier of receipt in good
condition of shipment covered by our invoice.
If any of the goods called for on this bill of lading are
shorted or damaged, do not accept them until the
carrier makes a notation on the freight bill of the
shorted or damaged goods. Do this for your own
protection.
NOTIFY
Challenger Lifts
AT ONCE if any hidden
loss or damage is discovered after receipt.
IT IS DIFFICULT TO COLLECT FOR LOSS OR
DAMAGE AFTER YOU HAVE GIVEN THE
CARRIER A CLEAR RECEIPT.
File your claim with
Challenger Lifts
promptly.
Support your claim with copies of the bill of lading,
freight bill, and photographs, if available.
Component Packing List
PART #
QTY/
LIFT
DESCRIPTION
15000 18000
12001 12001-18 1 P
OWER
C
OLUMN
A
SS
’
Y
12002 12002-18 1 I
DLER
C
OLUMN
A
SS
’
Y
12004 1
O
VERHEAD
P
ACK
15-18000-HW-X 1
H
ARDWARE
B
OX
B12048S-1 4
A
RM
A
SSEMBLY
12102
2
C
OLUMN
E
XT
.
(14’-6”
O.A.
H
T
.)
12022 C
OLUMN
E
XT
.
(16’-6”
O.A.
H
T
.)
12074 1
O
VERHEAD
S
HUTOFF
B
AR
A
SS
’
Y
12045 1
O
VERHEAD
L
IMIT
S
WITCH
12100
2
S
YNC
.
C
ABLE
A
SS
’
Y
(14’-6”)
12019 S
YNC
.
C
ABLE
A
SS
’
Y
(16’-6”)
B12069 4
A
DAPTER
E
XTENSION
(4”)
B12068 2
A
DAPTER
E
XTENSION
(8”)
12071 2
A
DAPTER
R
ACK
12093 4
A
RM
R
ESTRAINT
A
SSEMBLY
12119 12087-19
1
P
OWER
U
NIT
–
S
INGLE
P
HASE
12089 12089-19
P
OWER
U
NIT
–
T
HREE
P
HASE
15-18000-LP-X 1
L
ITERATURE
P
ACK
A
CCEPTED
O
ILS
–
Do not use oils with detergents
Hydraulic fluid is not provided with the lift shipment
-10
wt.
anti-foam, anti-rust hydraulic / biodegradable oil
-Dexron III ATF
I
NSTALLATION
S
AFETY
R
EQUIREMENTS FOR
I
NSTALLATION AND
S
ERVICE
Refer to ANSI/ALI ALIS (current edition)
I
MPORTANT
:
Always wear safety glasses while installing lift.
T
OOLS
(
MINIMUM REQUIRED
)
a. Tape measure, 16ft
b. Chalk
line
c. 4ft
level
d. 10” adjustable wrench
e. Standard open end wrenches 7/16”, 1/2",
(2) 9/16”, (2) 11/16”, 3/4"
f. 5/16” allen wrench
g. Needle
nose
pliers
h. Hammer drill with 3/4” diameter carbide tipped
bits
i. 2 lb hammer
j. Torque wrench: 150 foot pounds minimum with 1
1/8” socket
k. 12 ft. Step ladder
l. Anti-Seize lubricant (for arm pins and foot pad
screw threads and stop rings)
L
AYOUT
1) Layout the service bay according to the
architect’s plans or owners instructions
(see Fig.
1b
).
Failure to install in this orientation can
result in personal and property damage.
Be
certain that the proper conditions exist, see page
3.
2) Assemble column extension to column using
3/8”-16 x 3/4" lg Hex flange head bolt. Repeat for
opposite column and extension.
3) Erect and align both column assemblies.
L
OCK
R
ELEASE
/P
AWL
Fig. 2 –
Locking Pawl Assembly