•
3
Wires
1.
Shrouds with adjuster cover
2. Trapeze
wires
3.
Forestay, jib halyard assembly
4.
Trapeze handles, rope lock and shock
cord + line + shackle
Ropes
1. Righting
line
2. Jib
sheet
3. Main
halyard
4.
Jib luff tensioner line
5.
Trampoline line (rear)
6. Jib
halyard
7. Cunningham
WIRES, ROPES & RIG
3
2
1
1
3
2
5
6
7
4
4
Part bag
:
1.
Full mounted mainsheet as-
sembly with hook
2.
Stay adjusters, clevis pins
and split rings
3. Cunningham
4. Jib
clew
blocks
5.
Jib furler assembly
6.
hawaian righting system
7. Silicone
Other pieces not shown above :
⇒
2 drain plugs (on the hulls)
⇒
Screws for bar fixing (on the
crossbars)
⇒
Main halyard wire (on the
mast).
1
2
4
3
5
7
6