background image

Installation

9 (12)

2.4

LED Indicators

1 2
3
5

4
6

LED 1 to 4

Model-specific information

LED 5

Serial subnetwork status

LED 6

Device status

LED

Indication

Meaning

1 - Network Status

Off

Offline or no power

Green

Online, IP address assigned

Green, flashing

No IP address assigned or no link

Red

Fatal error, IP address conflict

Alternating Red/Green

Firmware update in progress

2 - Module Status

Off

No power or IP address conflict

Green

Normal operation

Red

Fatal error

Alternating red/green

Firmware update in progress

3 - Link/Activity 1

4 - Link/Activity 2

Off

Link not detected or no power

Green

Link established (100 Mbit/s)

Green, flickering

Link activity (100 Mbit/s)

Red

Link established (10 Mbit/s)

Red, flickering

Link activity (10 Mbit/s)

5 - Subnet Status

Off

No power

Green

Running

Green, flashing

Running, one or more transaction
errors

Red

Transaction error/timeout or subnet
stopped

6 - Device Status

Off

No power

Green

Initializing

Green, flashing

Running

Red

Bootloader mode

Alternating red/green

Configuration invalid or missing

The Link/Activity LED indicators will show a red light for 10 Mbit/s connections.
This is normal and does not indicate an error.

Anybus

®

Communicator

Startup Guide

SP2444 1.0 en-US

Содержание Anybus Communicator IIoT

Страница 1: ...Anybus Communicator IIoT STARTUP GUIDE SP2444 1 0 en US ENGLISH...

Страница 2: ...ces assume liability or responsibility for any problems that may arise as a result from the use of undocumented features timing or functional side effects found outside the documented scope of this pr...

Страница 3: ...n this document to indicate safety information and other content of specific importance WARNING This instruction must be followed to avoid a risk of death or serious injury Caution This instruction mu...

Страница 4: ...al and IIoT network interfaces 3 Connect the configuration cable between the gateway and a PC 4 Connect the power cable and apply power 5 Check the LED indicators to verify that the gateway is running...

Страница 5: ...Push down to mount or remove 1 Hook the unit onto the upper lip of the rail and push gently downwards 2 Push the unit towards the rail until it snaps into place Remove from DIN rail 1 Push the unit ge...

Страница 6: ...nectors and Indicators 2 3 1 Overview Fig 2 Overview 1 LED indicators 2 DIN rail mount 3 Power connector 4 Serial subnetwork interface 5 PC connector 6 IIoT network interface Anybus Communicator Start...

Страница 7: ...5 RS 422 Tx x x 9 RS 485 RS 422 Tx x x Housing Shield x x x Do not connect Signal Ground to Protective Earth PE of other nodes on the subnetwork as this may damage the on board serial transceivers Con...

Страница 8: ...nnected correctly and of the recommended type Pin Signal 1 24 VDC 2 Power Ground 2 3 4 PC Connector RJ11 Pin Signal 1 GND signal ground 2 GND signal ground 3 RS 232 Rx input 4 RS 232 Tx output 2 3 5 E...

Страница 9: ...in progress 3 Link Activity 1 4 Link Activity 2 Off Link not detected or no power Green Link established 100 Mbit s Green flickering Link activity 100 Mbit s Red Link established 10 Mbit s Red flicke...

Страница 10: ...t consumption Typical 100 mA 24 VDC Maximum 200 mA 24 VDC Galvanic isolation Yes on both network sides Mechanical rating IP20 NEMA rating 1 Mounting DIN rail EN 50022 Network shield conductance via DI...

Страница 11: ...Change Subscription Maximum 80 data point tags max 2 clients with up to 40 tags per client MQTT functionality MQTTclient acting as publisher MQTT version 3 1 1 supported Json data encoding supported Q...

Страница 12: ...last page 2018 HMS Industrial Networks Box 4126 300 04 Halmstad Sweden info hms se SP2444 1 0 en US 2018 11 22 10688...

Отзывы: