background image

Installation

4 (12)

2

Installation

2.1

Installation Overview

Prerequisites

The following items are required for installation and basic configuration:

Configuration cable

Subnetwork cable

Ethernet cable

Anybus Configuration Manager - Communicator RS-232/422/485
(4.5.0.0 or later)

Anybus Configuration Manager - IIoT

IPconfig (3.2.1.1 or later)

The Anybus Configuration Manager and IPconfig applications can be
downloaded from

www.anybus.com/support

.

Basic installation steps

1.

Mount the Anybus Communicator on the DIN rail.

2.

Connect the serial and IIoT network interfaces.

3.

Connect the configuration cable between the gateway and a PC.

4.

Connect the power cable and apply power.

5.

Check the LED indicators to verify that the gateway is running and that the
serial and IT networks are connected. See

LED Indicators, p. 9

.

6.

Use Anybus Configuration Manager - Communicator to set up the data
exchange configuration in the Anybus Communicator.

7.

Use IPconfig to configure the TCP/IP settings for the Anybus Communicator.

8.

Use Anybus Configuration Manager - IIoT to create a tag configuration and
transfer it to the Anybus Communicator.

9.

Connect to the web interface of the Anybus Communicator and configure
MQTT/OPC UA communication.

Anybus

®

Communicator

Startup Guide

SP2444 1.0 en-US

Содержание Anybus Communicator IIoT

Страница 1: ...Anybus Communicator IIoT STARTUP GUIDE SP2444 1 0 en US ENGLISH...

Страница 2: ...ces assume liability or responsibility for any problems that may arise as a result from the use of undocumented features timing or functional side effects found outside the documented scope of this pr...

Страница 3: ...n this document to indicate safety information and other content of specific importance WARNING This instruction must be followed to avoid a risk of death or serious injury Caution This instruction mu...

Страница 4: ...al and IIoT network interfaces 3 Connect the configuration cable between the gateway and a PC 4 Connect the power cable and apply power 5 Check the LED indicators to verify that the gateway is running...

Страница 5: ...Push down to mount or remove 1 Hook the unit onto the upper lip of the rail and push gently downwards 2 Push the unit towards the rail until it snaps into place Remove from DIN rail 1 Push the unit ge...

Страница 6: ...nectors and Indicators 2 3 1 Overview Fig 2 Overview 1 LED indicators 2 DIN rail mount 3 Power connector 4 Serial subnetwork interface 5 PC connector 6 IIoT network interface Anybus Communicator Start...

Страница 7: ...5 RS 422 Tx x x 9 RS 485 RS 422 Tx x x Housing Shield x x x Do not connect Signal Ground to Protective Earth PE of other nodes on the subnetwork as this may damage the on board serial transceivers Con...

Страница 8: ...nnected correctly and of the recommended type Pin Signal 1 24 VDC 2 Power Ground 2 3 4 PC Connector RJ11 Pin Signal 1 GND signal ground 2 GND signal ground 3 RS 232 Rx input 4 RS 232 Tx output 2 3 5 E...

Страница 9: ...in progress 3 Link Activity 1 4 Link Activity 2 Off Link not detected or no power Green Link established 100 Mbit s Green flickering Link activity 100 Mbit s Red Link established 10 Mbit s Red flicke...

Страница 10: ...t consumption Typical 100 mA 24 VDC Maximum 200 mA 24 VDC Galvanic isolation Yes on both network sides Mechanical rating IP20 NEMA rating 1 Mounting DIN rail EN 50022 Network shield conductance via DI...

Страница 11: ...Change Subscription Maximum 80 data point tags max 2 clients with up to 40 tags per client MQTT functionality MQTTclient acting as publisher MQTT version 3 1 1 supported Json data encoding supported Q...

Страница 12: ...last page 2018 HMS Industrial Networks Box 4126 300 04 Halmstad Sweden info hms se SP2444 1 0 en US 2018 11 22 10688...

Отзывы: