7 Instrukcja obsługi dla użytkownika.
Dear User, to use all advantages of the Holz Master boiler, read these instructions and the
instructions accompanying the controller before operation - this will ensure comfortable and long
lasting boiler operation. Detailed information on the electronic control of the boiler are contained in
the said manual instruction of the controller.
7.1 Firing up the boiler.
Before firing the boiler:
Check that there is enough water in the central heating system;
Check that the air supply system is not blocked – during all combustion time, it must
provide fresh air supply needed for the combustion process;
Check that the chimney is not blocked - it can become clogged after long breaks in
operation;
Adjust the chimney draft lever opening, if installed, so as to provide adequate chimney draft;
Check that the exhaust system is not blocked;
Check for proper connection of the thermostatic valve – if the cooling coil is used.
In order to fire up the boiler:
Load fuel to the upper chamber of the boiler;
Turn the boiler controller on;
Put a dry paper on the fuel, then fine, dry wooden chips or good-quality light-up barbecue
fuel in solid form;
Fire the paper and after firing up the wood or barbecue fuel, switch the boiler controller into
the firing mode;
After ignition of the fuel and increase of the device temperature, the controller changes into
operating mode.
In order to accelerate and facilitate the process of fuel ignition it is possible to open slightly the
cleaning hatch of the upper chamber, allowing for sucking extra air for the firing process. To do
this, loosen the butterfly handles of the cleaning hatch so it is loosely based on them, without
falling down and without opening the inspection hatch. The firing process should be then
continuously monitored, paying particular attention to whether the no smoke or flames are emitted
Holz Master Manual
wer. 22/05/2012/EN/V1.0
HKS LAZAR
str.14