HK Instruments DPT-MOD Series Скачать руководство пользователя страница 2

Copyright HK Instruments 2020

www.hkinstruments.fi

Installation version 7.0 2020

SCHEMATICS

DIMENSIONAL DRAWINGS

Figure 1a - Surface mounting

MOUNTING THE DEVICE 

CONTINUED

Figure 1b - Mounting orientation

Figure 1c - Application connections

Connection for display

Terminal block

Pressure

sensor

Menu buttons

LED

SELECT

UP

DOWN

ZERO

B

A

24 V

GND

90.0

77.0

71.5

53.0

4.2

95.0

36.0

DPT

The pressure tubes are connected to a flow measurement probe (i.e. FloXact), or to the 
measurement ports specified by the fan manufacturer. Please see the FloXact installation 
guide or the fan manufacturer’s technical specifications for more information.

YES

NO

NO

INSTALLATION

1) Mount the device in the desired location (see step 1).
2) Open the lid and route the cable through the strain relief and 

connect the wires to the terminal block(s) (see step 2).

3) The device is now ready for configuration.

 

  WARNING! Apply power only after the device is properly wired.

STEP 2: WIRING DIAGRAMS

For CE compliance, a properly grounded shielding cable is required.
1) Unscrew the strain relief and route the cable. 
2) Connect the wires as shown in figure 2.
3) Tighten the strain relief.

Figure 2 - Wiring diagram

B
A

24 V

GND

+ Power supply

24 VDC / 24 VAC

Modbus

STEP 1: MOUNTING THE DEVICE

1) Select the mounting location (duct, wall, panel).
2) Use the device as a template and mark the screw holes.
3) Mount with appropriate screws.

Pressure

Flow

Static pressure

Filter/Damper

monitoring

Fan/Blower

monitoring

Not

connected

Содержание DPT-MOD Series

Страница 1: ... monitoring across centrifugal fans and blowers in duct air flow or pressure monitoring measuring air flow or pressure in VAV applications SPECIFICATIONS Performance Accuracy at applied pressure Model 2500 Pressure 125 Pa 1 2 Pa Pressure 125 Pa 1 1 Pa Model 7000 Pressure 125 Pa 1 5 2 Pa Pressure 125 Pa 1 5 1 Pa Accuracy specifications include general accuracy linearity hysteresis long term stabili...

Страница 2: ...YES NO NO INSTALLATION 1 Mount the device in the desired location see step 1 2 Open the lid and route the cable through the strain relief and connect the wires to the terminal block s see step 2 3 The device is now ready for configuration WARNING Apply power only after the device is properly wired STEP 2 WIRING DIAGRAMS For CE compliance a properly grounded shielding cable is required 1 Unscrew th...

Страница 3: ...rom common probe manufacturer s specifications Available K value range 0 001 9999 000 K VALUE 9000 000 SELECT UP DOWN 8 Select the address for Modbus 1 247 9 Select the baud rate 9600 19200 38400 ADDRESS 99 SELECT UP DOWN BAUD RATE 9600 SELECT UP DOWN 10 Select the parity bit None Even Odd PARITY BIT NONE SELECT UP DOWN STEP 4 ZEROING THE DEVICE NOTE Always zero the device before use To zero the d...

Страница 4: ...ith the autozero calibration are virtually maintenance free 3 Via Modbus register Make sure there is no pressure in the duct when the zeroing is done via Modbus register turns on and the display reads zeroing display option only see Figure 6 c The zeroing of the device will proceed automatically Zeroing is complete when the LED turns off and the display reads 0 display option only d Reinstall the p...

Отзывы: