Copyright HK Instruments 2019
www.hkinstruments.fi
Installation version 8.0 2019
SCHEMATICS
DIMENSIONAL DRAWINGS
INSTALLATION
Figure 1a - Surface mounting
STEP 1: MOUNTING THE DEVICE
1) Mount the device in the desired location (see step 1).
2) Open the lid and route the cable through the strain relief and
connect the wires to the terminal block(s) (see step 2).
3) The device is now ready for configuration.
WARNING! Apply power only after the device is properly wired.
1) Select the mounting location (duct, wall, panel).
2) Use the device as a template and mark the screw holes.
3) Mount with appropriate screws.
Figure 1b - Mounting orientation
Figure 1c - Application connections
DPT
DPT
Display connection
A
B
24 V
GND
LEDs
Joystick 1
Joystick 2
Joystick 3
Select
Up
Down
Menu buttons
Terminal
blocks
Pressure
sensor
Input terminal
configuration
jumpers
Input 1
Input 2
GND
GND
Input
Output
YES
NO
NO
Static pressure
Filter/Damper
monitoring
Fan/Blower
monitoring
Not
connected