MAINTENANCE 

CONSERVATION AND CLEANING 

Precaution! 

 

  Do not use aggressive cleaning products nor varnish solvents.  

  Avoid water penetration inside the motor or the electronic components (e.g. through the direct contact with joints or 

holes of the motor), observe the protection class (IP).  

Electrical  circuit

:  Make  sure  that  all  the  electrical  connections 

–wires,  contactors  and  terminals-  are  properly  tight. 

Register the readings of kW and amperes at each compressor and fan motor phase. Check the start current. Check that 
all the mechanical components, pressure switches and so on are working properly. 

Refrigeration  circuit

:  Check  if  there  is  any  refrigerant  leak,  noises  or  vibration.  Proceed  to  measuring  temperatures 

and/or  pressures  of  the  most  important  components  of  the  system  and  register  them  on  the  maintenance  sheet 
(compressor discharge and suction, expansion valve, exchangers’inlet and outlet, etc…). 

Compressor: 

Check regularly the lubricant level, the presence of vibrations or noise and the motor insulation. 

Drainage system

: Verify the condition and the correct operation of the drainage tray and drain trap. It is necessary to 

clean the condensate trays after the first day of operation. Then, clean them at least once a year. Take into account the 
meteorological conditions, e.g. in areas where falling leaves or the flight of seeds  may obstruct the drain trap. Clean 
them also at mid and late spring and autumn. The dates are approximate and will depend on the plants blooming, falling 
leaves and seeds seasons. Other factors such as human activities may interfere in the cleanliness conditions. 

Air filters: 

Clean the filters after the first operating hours to remove possible light materials such as pieces of paper or 

polystyrene,  etc.  that  may  have  been  dragged  through  air  circulation.  Clean  again  every  3  months  (or  more  often 
depending on operation). The filters can be cleaned with soapy water. Then rinse them with clean water and let dry. If 
necessary  replace  the  filters  before  they  are  in  poor  conditions  (refer  to  the  current  legislation,  EN  779,  UNE-EN 
13053…). 

Coils

: At least once a year clean the coils with water and detergent, then dry with air at low pressure. Never clean with a 

wire brush, water and/or air at high pressure (max. 6 bar). 

Fans: 

Check the direction of rotation of the fans, verify  the supporting parts. Check the transmission elements and the 

operating status. 

Before handling the fan make sure that it is disconnected from the main power supply even though it is already stopped 
and control that nobody may start it during the intervention.  

-

  A regular inspection of the unit is required to avoid dirt accumulation in propellers, turbines, motors and grids that 

could entail risks and significantly shorten their life. The frequency will depend on the working conditions.  

-

  Keep the airways of the fan free 

– danger because of objects dropping out! 

-

  Check the free flow of the condensation water through the evacuation openings is necessary (if there are any).  

-

  During cleaning operations be very careful not to unbalance the propeller or the turbine. 

-

  In case of incorrect cleaning operations no guarantee is assumed regarding corrosion formation / paint adhesion for 

unpainted / painted fans.  

-

  To avoid humidity accumulation in the motor the fan must be operated during at least 1 hour at 80 to 100% of its 

maximum speed before cleaning!  

-

  After cleaning, the fan must be operated during 2 hours at 80 to 100% of the maximum speed to dry it! 

-

  Check the fan regularly to detect possible mechanical vibrations (recommended every 6 months). Keep in mind the 

limit values indicated the ISO 14694 and perform correction measures in case of exceeding them (e.g. posterior 
balance to be completed by trained specialists). 

-

  Check the impeller, in particular weld-seams, for possible cracks.  

-

  The fan or motor is maintenance-

free due to the use of ball bearings with “life-long lubrication”. At the end of the 

grease life (30-40.000h approx.) it is necessary to replace the bearing. Please contact our Service Department in this 
case as for all other damage (e.g. to the coil or electronics).  

 
 

 

Содержание ACVIBA HE 35i

Страница 1: ...IR COMPACT VERTICAL INVERTER Models 35i 40i 45i 55i 70i 80i Cooling capacities from 7 3 kW to 82 3 kW Heating capacities from 6 5 kW to 70 2 kW INSTALLATION OPERATION MAINTENANCE MANUAL IOM_ACVIBA HE_...

Страница 2: ...or over 35 years Our approach is based on efficiency flexibility and on practical solutions This has been the hallmark of our product catalogue The versatility of our factory allows us to deliver solu...

Страница 3: ...ACVIBA HE 35I 40I 12 ACVIBA HE 45I 80I 13 TRANSPORT 14 INSPECTION AT RECEPTION 14 WEIGHT DISTRIBUTION KG 14 RIGGING 15 STORAGE 16 INSTALLATION 17 INSTALLATION SITE 17 SERVICE AREA MM 17 UNIT SETTLEME...

Страница 4: ...h Tune internal temperature probe 24 Operation modes 24 Indoor Fan Modes 24 Time schedule 25 Alarms 26 DIAGNOSIS OF THE ALARMS 26 TH TUNE Description of the alarm codes 26 EC MOTOR FANS 28 Diagnosis F...

Страница 5: ...design and performance to which we are committed to gives us the right to modify the specifications of our products without prior notice Electrical Supply Check that the electrical network features c...

Страница 6: ...ions shall always be carried out by trained personal exclusively and authorized by the manufacturer using original spare parts The safety devices of the unit could be damaged in case of non compliance...

Страница 7: ...pressure of the system the high temperature of some of its parts and the electrical components Do not install the unit in an explosive atmosphere If the motor of the fan runs independently after the u...

Страница 8: ...r a power failure or a main disconnection an automatic restart of the fan takes place when power supply returns Never approach the fan until it has stopped completely as it may be rotating even though...

Страница 9: ...ntial GWP 5 2088 CIRCUIT 1 Compressor type Scroll BLDCM Number of compressors 1 1 Oil type PVE FV50S Oil volume L 2 3 1 7 2 3 CIRCUIT 2 Compressor type Scroll BLDCM Number of compressors 1 Oil type PV...

Страница 10: ...ing to standard 1 Pa 60 Available static pressure Max flow Pa Up to 60 Pa Available high pressure 2 Max flow Pa 250 200 550 550 250 200 DIMENSIONS AND WEIGHT Length mm 1 423 2 800 Width mm 854 Height...

Страница 11: ...INVERTER IOM_ACVIBA HE_35ia80i_207910_190501_EN DIMENSIONS ACVIBA HE 35i 40i Units with 1 circuit ACVIBA HE 45i 80i Units with 2 circuits 1 Main switch 2 Electrical box 3 Drainage 4 Outdoor coil 5 Ind...

Страница 12: ...t 1 Compressor 2 4 way valve 3 Electronical expansion valve EEV 4 Check valve 5 Filter 6 Liquid container 9 Outdoor coil 10 Outdoor fan 11 Indoor coil 12 Indoor fan HP High pressure switch PT Pressure...

Страница 13: ...ts 1 Compressor 2 4 way valve 3 Electronical expansion valve EEV 4 Check valve 5 Filter 6 Liquid container 9 Outdoor coil 10 Outdoor fan 11 Indoor coil 12 Indoor fan HP High pressure switch PT Pressur...

Страница 14: ...specified in the order and or the options stated in the order If this is not the case please contact the transport company immediately within 48h Verify the correct voltage of the nameplate and make s...

Страница 15: ...ilt the unit more than 15 degrees during transportation Always transport the unit in its original packaging to the place of installation All units come with a particular rigging diagram of that model...

Страница 16: ...1 Moreover when temperatures decrease water condensation may occur inside the machine or between the machine and the plastic wrap Avoid placing objects on top of the unit unless this is permitted acco...

Страница 17: ...REA mm UNIT SETTLEMENT Make sure that the unit is slightly inclined 2 following the direction of the drains The bed frame shall be big enough and strong enough to support the unit weight DRAINAGE All...

Страница 18: ...aintenance operations is needed in particular where there is only one possible access Use ducts made of non inflammable material in order to avoid any risk of fire as a consequence of the deflagration...

Страница 19: ...nstalled by the installer according to the current local laws that apply to the installation site The interconnecting wires shall be protected in a tube or an electrical cable conduit cable tray etc T...

Страница 20: ...ts Connected to the secondary control board serial feature with the main controller Master CONNECTION OF THE PGD1 or the Mini PGD controllers options Always connected to the main controller CONNECTION...

Страница 21: ...k that the electrical wiring diagram is available as it is an essential document to complete the connection operations Check that all the electrical connections are tight Check the power supply voltag...

Страница 22: ...s well as the suction and discharge pressure of each compressor Remember that it is necessary to clean the air filters after the first 4 hours of operation Complete at least 3 cooling cycle operations...

Страница 23: ...23 C HEATING CYCLE Dry Humid Dry Humid Minimum 12 C 13 C 16 C Maximum 24 C 18 C 24 C Please contact Hitecsa for changes of the controller adjustment These units can be running at a maximum altitude o...

Страница 24: ...or log in Turn the central button until the option PCAL is displayed and select Turn the central button to modify the correction value and press for validation Operation modes Press the Mode button to...

Страница 25: ...button and chose Time band or select Esc to leave In general so as to move through the different displays turn the central button and select by pressing it Turn the central button to select the desir...

Страница 26: ...e U12 P Condenser PA17 High pressure critical C1 Pb17 Low pressure critical C1 Pn17 Min pressure critical C1 PA27 High pressure critical C2 Pb27 Low pressure critical C1 Pn27 Min pressure critical C1...

Страница 27: ...err2 C2 u228 Al_drive_overload C2 u229 Al_Inv_Reserved8 C2 u230 Al_Unexpected_Inv_Stop C2 dt13 Thermal Vint C1 dt24 Thermal Vint C2 dt16 Thermal Vext C1 dt27 Thermal Vext C2 dh00 Smoke detector Alarm...

Страница 28: ...the fan might not be able to start Fan turns too slowly Impeller blade scrapes brushes When indicated clear foreign bodies dirt from the fan Active temperature management effective Motor or electronic...

Страница 29: ...gement 3x Open HALL IC fault 4x Open Line failure only for 3 types 5x Open Motor blocked 6x Open IGBT fault 7x Open DC under voltage 8x Open DC overvoltage 9x Closed IGBT cooling down period 11x Open...

Страница 30: ...cessary in case of small leaks If a gas leak is detected proceed to removing and recuperating the entire refrigerant charge Pressurize the system with dry nitrogen If no leak is detected proceed to va...

Страница 31: ...th soapy water Then rinse them with clean water and let dry If necessary replace the filters before they are in poor conditions refer to the current legislation EN 779 UNE EN 13053 Coils At least once...

Страница 32: ...i modificaciones en el aparato Todas las modificaciones planificadas deben ser aprobadas por escrito por el fabricante Use only spare parts wear parts original accessories from the manufacturer of the...

Страница 33: ...osion pre treated coil Condenser Anti corrosion pre treated coil evaporator Free Cooling mixing module 2 dampers Contact Hitecsa Thermoenthalpic Free Cooling mixing module 2 dampers Contact Hitecsa Th...

Страница 34: ...high temperatures flames burning surfaces and excess humidity Hazardous Reactions Contact with certain red hot metals may result in exothermic or explosive reactions and yield toxic and or corrosive d...

Страница 35: ...35 ACVIBA HE AIR AIR PACKAGED UNITS COMPACT VERTICAL INVERTER IOM_ACVIBA HE_35ia80i_207910_190501_EN Subject to modifications without prior notice...

Отзывы: