![Hitecsa ACVA STD 1001 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/hitecsa/acva-std-1001/acva-std-1001_installation-operation-and-maintenance-instructions_2140033009.webp)
ACVA - ACVBA
Installation, operation and maintenance instructions
9
ELECTRIC CONNECTIONS
Legend
1.
Main power 400/3/50 + neutral
2.
Earth
3.
Crankcase heater (230/1/50)
4.
Time-delay fuses or circuit breaker (MCB) curve D
5.
Main power switch
6.
Remote control
WARNING!
Before starting installation, service or maintenance, turn off the main power switch in order
to avoid electrical shock that may cause personal damages.
•
Main power supply of the unit should agree with the data shown on the nameplate.
HITECSA will not be held responsible for damages resulted from non observance of the
above.
•
Always use the wiring diagram sent with the unit to make electrical connections.
•
Check that the crankcase heater has been working at least 24 hours prior to the start up of
the unit.
•
Current supply should be within 10% of Volts and Amperes indicated on the unit
nameplate.
•
Do not operate the unit at different current from that shown on the unit nameplate.
•
The installer should put line protection elements in compliance with current legislation.
•
The interconnecting wires should be protected with a tube or put inside a groove channel.
2
1
4
5
3
6
Содержание ACVA STD 1001
Страница 14: ...ACVA ACVBA Installation operation and maintenance instructions 14 DIMENSIONS ACVA ACVBA 351 501...
Страница 15: ...ACVA ACVBA Installation operation and maintenance instructions 15 ACVA ACVBA 701 801...
Страница 16: ...ACVA ACVBA Installation operation and maintenance instructions 16 ACVA ACVBA 1001 1201...
Страница 17: ...ACVA ACVBA Installation operation and maintenance instructions 17 ACVA ACVBA 1402 1502 1602...
Страница 18: ...ACVA ACVBA Installation operation and maintenance instructions 18 ACVA ACVBA 2002 2302 2402...