Installation, operation and maintenance instructions 

INTRODUCTION 

 

 

The  contents  of  this  manual  are  designed  to  assure  the  correct  installation,  adjustment  and 
maintenance of the unit, therefore:  
 

 

Read the instructions with due care and attention. 

 

The  appliance  must  be  installed,  tested  and  serviced  by  properly  qualified  staff 
licensed in accordance with the established legislation.  

 

The manufacturer declines all liability and warranty coverage is automatically waived, 
if electrical and/or mechanical modifications to the unit. Tampering and unauthorized 
repairs or modifications to the unit will automatically void the warranty. 

 

Observe the safety regulations in force at the time of installation. 

 

Make  sure  that  the characteristics of  the mains  network conform  to the  data on  the 
serial number plate placed on the unit. 

 

Keep  this  manual  and  the  wiring  diagram  with  care  and  make  sure  that  they  are 
available for consultation by the operator whenever necessary. 

 

Packing  materials  (plastic  wrappings,  expanded  polystyrene,  etc)  are  potentially 
hazardous  and  must  be  kept  out  of  reach  of  children.  Recycle  packing  materials  in 
accordance with local legislation.  

 

The  units  must  be  used  only  for  the  purpose  for  which  they  are  designed  .The 
manufacturer  bears  no  responsibility  in  the  case  of  applications  other  than  the 
specified use. 

 

Disconnect the unit in the event of breakdowns or malfunctions. 

 

If repairs are necessary, use only HITECSA approved service centres and always insist 
on  original  spare  parts.  The  use  of  non-original  parts  and/or  unauthorized  service 
centres may result in unsafe operation of the unit. 

 
REGULATIONS AND CERTIFICATIONS 
 
ISO 9001:2008 certification:

 HITECSA AIRE ACONDICIONADO S.L.U.,  trying always to find the 

customer  satisfaction,  has  obtained  the  ISO  9001:2008  Quality  System  referred  to  its 
production  activity.  This  will  results  in  a  continuous  determination  to  improve  quality  and 
reliability  of  all  our  products;  commercial  activities,  design,  raw  materials,  production  and 
after-sales service, are the means to reach our goal.  

 

 

 
CE marking: 

our machines have got the CE mark, in conformity with the essential requirements 

of  the  applicable  EC  directives  and  their  last  modifications  as  well  as  with  the  national 
legislation of each country. 
 

 

 

Содержание ACVA STD 1001

Страница 1: ...ACVA ACVBA Installation operation and maintenance instructions 1 Installation operation and maintenance instructions ACVA Cooling Only ACVBA Heat Pump SELF CONTAINED VERTICAL UNITS MONOBLOC AIR AIR...

Страница 2: ...Installation operation and maintenance instructions 2 INDEX INTRODUCTION 3 SAFETY PRECAUTIONS 4 RECEPTION 5 INSTALLATION LOCATION 6 START UP 8 TECHNICAL DATA 11 DIMENSIONS 14 REFRIGERANT CHARGE 18 MAI...

Страница 3: ...are potentially hazardous and must be kept out of reach of children Recycle packing materials in accordance with local legislation The units must be used only for the purpose for which they are design...

Страница 4: ...operation and maintenance instructions as well as the ones indicated in labels of the unit Do not forget to strictly follow any other safety codes Use safety glasses work gloves and any other safety a...

Страница 5: ...tely file a claim with the transport company Verify the correct voltage of the nameplate and make sure it s in accordance with local power supply In case of any flaw or anomaly detected please contact...

Страница 6: ...aximum 50 C minimum 10 C Maximum humidity 90 INSTALLATION LOCATION Check if the base is able to support the weight of unit during operation Reserve a minimum service area according to Fig 2 Choose a p...

Страница 7: ...tenance instructions 7 UNIT SETTLEMENT Make sure that the unit is correctly levelled The bed frame should be strong and solid enough to support the weight of the machine Verify that the indoor drain i...

Страница 8: ...Fans rotate in the right direction START UP Start up should be performed by qualified technical people Use a start up check list record inlet and outlet temperatures and pressures outdoor air temperat...

Страница 9: ...ta shown on the nameplate HITECSA will not be held responsible for damages resulted from non observance of the above Always use the wiring diagram sent with the unit to make electrical connections Che...

Страница 10: ...than the unit connection depending on line length and general building configuration Drainage line should have a minimum inclination of 2 for proper water evacuation When drainage line is exposed to t...

Страница 11: ...0 3540 4720 4720 Available static pressure Pa 43 50 60 55 55 Model 10 10 DD 10 10 SS 10 10 SS 12 12 SS 12 12 SS Capacity kW 0 25 0 55 0 55 0 75 0 75 Speed r p m 872 870 1032 809 809 Voltage Total inpu...

Страница 12: ...ssure Pa 53 83 73 91 130 Model 12 12 SS 12 12 SS 12 12 G2L 12 12 G2L 12 12 G2L Capacity kW 1 1 1 1 1 1 1 5 1 5 Speed r p m 891 910 800 896 862 Voltage Total input power cooling kW 10 9 10 9 13 4 14 4...

Страница 13: ...2 2 2 3 3 3 Speed r p m 913 913 734 787 734 Voltage Total input power cooling kW 19 8 20 8 27 0 28 3 34 2 Total input current cooling A 36 0 37 0 48 1 56 1 57 2 Total input power heating kW 17 5 18 6...

Страница 14: ...ACVA ACVBA Installation operation and maintenance instructions 14 DIMENSIONS ACVA ACVBA 351 501...

Страница 15: ...ACVA ACVBA Installation operation and maintenance instructions 15 ACVA ACVBA 701 801...

Страница 16: ...ACVA ACVBA Installation operation and maintenance instructions 16 ACVA ACVBA 1001 1201...

Страница 17: ...ACVA ACVBA Installation operation and maintenance instructions 17 ACVA ACVBA 1402 1502 1602...

Страница 18: ...ACVA ACVBA Installation operation and maintenance instructions 18 ACVA ACVBA 2002 2302 2402...

Страница 19: ...fill the circuit with dry nitrogen Combustion of R410a refrigerant generates toxic gases Repair immediately any refrigerant leak Never overcharge the system Never use compressor as a vacuum pump If s...

Страница 20: ...ission belt at least twice during the first month of operation and then check every 1 000 hours Fan and motors do not need additional lubrication Drainage system verify condition and good operation of...

Страница 21: ...allation operation and maintenance instructions 21 www hitecsa com HITECSA AIRE ACONDICIONADO S L U Masia Torrents 2 08800 Vilanova i la Geltr Barcelona SPAIN Tel 34 93 893 49 12 Fax 34 93 893 96 15 i...

Отзывы: