Group 1 Precautions for Disassembling and Assembling
SECTION 1 GENERAL
W1-1-1-5
Maintenance Standard Terminology
“Standard”
1. Dimension for parts on a new machine.
2. Dimension of new components or assemblies
adjusted to specification. Allowable errors will be
indicated if necessary.
“Allowable Limit”
1. Normal machine performance cannot be
accomplished after exceeding this limit.
2. Repair or adjustment is difficult after exceeding this
limit.
3. Repair or adjustment is impossible after exceeding
this limit.
Therefore, in consideration of operation efficiency
and maintenance expense, proper maintenance
shall be carried out before reaching the “Allowable
Limit”.
Содержание ZX200-5G
Страница 2: ......
Страница 6: ...SYMBOL AND ABBREVIATION SY 2 Blank ...
Страница 50: ...DCDW 1 2 Blank ...
Страница 56: ...Group 1 Precautions for Disassembling and Assembling SECTION 1 GENERAL W1 1 1 6 Blank ...
Страница 72: ...Group 4 Bleeding Air SECTION 1 GENERAL W1 4 1 6 Blank ...
Страница 74: ...Group 5 Pressure Release Procedure SECTION 1 GENERAL W1 5 1 2 Blank ...
Страница 76: ...Group 6 Preparation SECTION 1 GENERAL W1 6 1 2 Blank ...
Страница 77: ...MEMO ...
Страница 78: ...MEMO ...
Страница 80: ...DCDW 2 2 Blank ...
Страница 84: ...Group 1 Upperstructure SECTION 2 MAINTENANCE STANDARD W2 1 1 4 Blank ...
Страница 88: ...Group 1 Upperstructure SECTION 2 MAINTENANCE STANDARD W2 1 2 4 Blank ...
Страница 92: ...Group 2 Undercarriage SECTION 2 MAINTENANCE STANDARD W2 2 1 4 Blank ...
Страница 94: ...Group 2 Undercarriage SECTION 2 MAINTENANCE STANDARD W2 2 2 2 Blank ...
Страница 100: ...Group 2 Undercarriage SECTION 2 MAINTENANCE STANDARD W2 2 4 4 Blank ...
Страница 108: ...Group 3 Front Attachment SECTION 2 MAINTENANCE STANDARD W2 3 2 2 Blank ...
Страница 109: ...MEMO ...
Страница 110: ...MEMO ...
Страница 112: ...DCDW 3 2 Blank ...
Страница 148: ...Group 1 Cab SECTION 3 UPPERSTRUCTURE W3 1 2 20 Blank ...
Страница 194: ...Group 6 Hydraulic Oil Tank SECTION 3 UPPERSTRUCTURE W3 6 1 8 Blank ...
Страница 202: ...Group 7 Fuel Tank SECTION 3 UPPERSTRUCTURE W3 7 1 8 Blank ...
Страница 228: ...Group 8 Pump Device SECTION 3 UPPERSTRUCTURE W3 8 3 18 Blank ...
Страница 290: ...Group 9 Control Valve SECTION 3 UPPERSTRUCTURE W3 9 4 16 Blank ...
Страница 346: ...Group 11 Pilot Valve SECTION 3 UPPERSTRUCTURE W3 11 5 10 Blank ...
Страница 369: ...MEMO ...
Страница 370: ...MEMO ...
Страница 372: ...DCDW 4 2 Blank ...
Страница 376: ...Group 1 Swing Bearing SECTION 4 UNDERCARRIAGE W4 1 1 4 Blank ...
Страница 382: ...Group 1 Swing Bearing SECTION 4 UNDERCARRIAGE W4 1 2 6 Blank ...
Страница 386: ...Group 2 Travel Device SECTION 4 UNDERCARRIAGE W4 2 1 4 Blank ...
Страница 398: ...Group 2 Travel Device SECTION 4 UNDERCARRIAGE W4 2 2 12 Blank ...
Страница 412: ...Group 2 Travel Device SECTION 4 UNDERCARRIAGE W4 2 5 2 Blank ...
Страница 442: ...Group 4 Track Adjuster SECTION 4 UNDERCARRIAGE W4 4 4 2 Blank ...
Страница 458: ...Group 5 Upper and Lower Roller SECTION 4 UNDERCARRIAGE W4 5 4 2 Blank ...
Страница 465: ...MEMO ...
Страница 466: ...MEMO ...
Страница 468: ...DCDW 5 2 Blank ...
Страница 486: ...Group 2 Cylinder SECTION 5 FRONT ATTACHMENT W5 2 2 6 Blank ...
Страница 499: ...MEMO ...
Страница 500: ...MEMO ...
Страница 502: ......