5-7
OPERATING THE MACHINE
Adjustment Procedures
IMPORTANT: Do not operate the machine with the bucket
dumped more than 10°.
1. After moving the bucket to the desired digging angle,
stop the engine.
2. Loosen lock nut (2) of the proximity switch. Slide the end
edge of leveler bar (3) up to the center of the sensitive
area (orange color). Then, tighten lock nut (2).
3. The angle is able to be set to more than one position by
setting the placement within the slot. Loosen nuts of
U-bolts (1) (2 used), move the bracket, and then tighten
the nuts.
4. After adjustment start the engine. Check that the bucket
can be stopped at the desired angle position.
M4GB-05-001
1
2
3
Содержание ZW 180-6
Страница 4: ......
Страница 10: ...CONTENTS MEMO ...
Страница 12: ...2 MACHINE NUMBERS Aftertreatment Device 1 SCR TYPE MFG NO 2 DOC TYPE MFG NO MNEK 00 003 MNEK 00 004 2 1 ...
Страница 52: ...S 40_70Z7B S 40 SAFETY LABELS 1 24 12 11 18 23 9 1 9 14 22 14 15 21 17 16 Battery Top 20 ...
Страница 62: ...S 50 SAFETY LABELS MEMO ...
Страница 204: ...2 2 BREAK IN MEMO ...
Страница 238: ...4 20 MOVING THE MACHINE MEMO ...
Страница 277: ...7 5 MAINTENANCE MEMO ...
Страница 404: ...MAINTENANCE 7 132 MEMO ...
Страница 408: ...9 4 MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS MEMO ...
Страница 412: ...10 4 STORAGE MEMO ...
Страница 418: ...12 2 SPECIFICATIONS MEMO ...
Страница 426: ...14 6 INDEX MEMO ...