PREPARATION
Model
Dimensions
A
B
deg.
mm
deg.
mm
RUA-NP13ATS
0.4
14
0.6
17
RUA-NP15ATS
0.4
14
0.6
17
RUA-NP20ATS
0.4
17
0.6
20
RUA-NP25ATS
0.4
21
0.6
21
RUA-NP30ATS
0.4
21
0.6
21
Fig. 2. Foundation Gradient
Model
Dimension (mm)
A
B
C
RUA-NP20ATS
2,308
1,968
RUA-NP25ATS
2,858
1,968
RUA-NP30ATS
2,858
2,068
Fig. 3. Recommended Concrete Curbs
1.3 Placing the Unit
Tools and Instruments
–
Pincers, Wrenches,
Facilities to Transport and Place the Unit.
Transportation
–
Transport the unit as close to
the final installation location as practical before
unpacking is performed. Keep the unit upright.
When transporting the unit after unpacking has
been performed, take note of the following.
Rolling
–
Place three equal - sized rollers under
the base frames. Each roller must carry both of the
outer frames, and must be situated to balance the
unit (refer to the center of gravity in Fig. 4).
Lifting by Forklift
–
Insert the forks under the
base frames from the indicated direction in Fig.4.
Lift the unit, exercising care to catch both of the
outer frames.
Rigging
–
Apply spreader bars to the top of the
unit, in order to prevent damage to the unit due to
cable scratches.
Unpacking
–
Follow the instructions marked on
the packing
For Models RUA-NP13ATS and RUA-NP15ATS For Models RUA-NP20ATS through RUA-NP30ATS