Remote
Controller
Holder for
Remote Controller
Screw (2 pieces)
OUTDOOR UNIT
●
Please mount the outdoor unit on stable ground
to prevent vibration and increase of noise level.
●
Decide the location for piping after sorting out
the different types of pipe available.
Please face this side (suction side)
of the unit to the wall
Please remove
the cover for
wire connection.
Procedure to remove the cover of
wiring terminals
●
Remove the screw (1
piece).
●
Hold the projected part at
the lower left of the cover
and push the cover
upwards to remove it.
●
To close the cover, insert
the upper part of the
cover into the body of
outdoor unit, then be sure
that the hook below the
cover is plugged in before
screwing.
Hook
Removal Of Air From The Pipe And Gas Leakage Inspection
Preparation of Pipe
1
●
Use a pipe cutter to cut the copper pipe.
●
Jagged edge will cause leakage.
●
Point the side to be trimmed downwards during trimming to prevent copper chips from
entering the pipe.
●
Before flaring, please put on the hexagon screw cap.
Spanner
Torque
wrench
Hexagon
screw nut
Pipe Connection
2
●
Please be careful when bending the copper pipe.
●
Applied frozen grease to the connection points and then screw in manually. After that, use
a torque wrench to tighten the connection.
INST
ALLA
TION OF COOLANT PIPES
AND AIR
REMOV
AL
Procedures of using Vacuum Pump for Air Removal
3
AIR REMOV
AL
CAUTION
!
Outer
diameter
of pipe
6.35 (1/4")
9.52 (3/8")
Valve head cap
Valve core cap
Torque N.m
(kgf
●
cm)
13.7 – 18.6 (140 – 190)
34.3 – 44.1 (350 – 450)
19.6 – 24.5 (200 – 250)
12.3 – 15.7 (125 – 160)
Small diameter side
Big diameter side
Lo
Hi
Meter showing pressure
Manifold valve
Vacuum pump
Charge
hose
When pumping starts, slightly loosen
the flare nut to check of air sucked in.
Then tighten the flare nut.
When the meter reaches –101KPa (–76cmHg)
during pumping, fully tighten the shuttle.
As shown in figure on the right, remove
the cap of valve head and valve core
and then connect them to the vacuum
pump and sub-division valve.
Fully tighten the “Hi” shuttle of the sub-
division valve and completely unscrew
the “Lo” shuttle. Run the vacuum pump
for about 10–15 minutes, then completely
tighten the “Lo” shuttle and switch off
the vacuum pump.
2
Completely unscrew the spindle of the
service valve (at 2 places) in anti-
clockwise direction to allow the flow of
coolant (using Allen key).
3
Remove the connection pipe and tighten
the cap of valve head. The task is then
completed.
4
Gas Leakage Inspection
Please use gas leakage detector to check if leakage occurs at
the connection of hexagon screw nut as shown on the right.
If gas leakage occurs, further tighten the connection to stop
leakage.
The body of
service valve
Cap of
valve core
Allen key
Cap of valve head
Cap of valve head
A
Mould
Mould
Copper pipe
Copper pipe
Trimming tool
Outer
Diameter (ø)
6.35 (1/4")
9.52 (3/8")
Imperial flaring tool
0.8 – 1.5
1.0 – 1.8
Rigid flaring tool
0 – 0.5
0 – 0.5
A (mm)
1
CONNECTION OF POWER CORD
●
The naked part of the wire core should be 14 mm and the insulated part of the wire must be push into the terminal for 3 – 4 mm.
Then try to pull the individual wire to check if the contact is tight. Improper insertion may burn the terminal.
●
Be sure to use only wire specified for the use of air-conditioner.
●
Please refer to the installation manual for wire connection and the wiring technique should meet the standards of electrical
installation.
●
There is a AC voltage drop between the AB terminals if the power is on. Therefore, be sure to remove the plug from its socket.
WARNING
!
FINAL
ST
AGE OF INST
ALLA
TION
Insulation And Maintenance Of Pipe Connection
1
●
The connected terminals should be completed sealed with
heat insulator and then tied up with rubber strap.
●
Please tie the pipe and power line together with plastic tape
as shown in the figure of installation of both the indoor and
outdoor units. Then fix their position with holders.
●
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
●
Completely seal any gap with putty.
Installation Of Remote Control
2
Earth Line And Circuit Breaker
3
Power Source And Operation Test
4
●
The remote controller can be placed in its holder which is
fixed on wall or beam.
●
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be fixed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the florescent light. Therefore, during
the installation of the remote control holder, please switch on
the light, even during day time, to determine the mounting
location of the holder.
CAUTION
!
●
The earth line terminal of the outdoor unit is below the
service valve.
●
To avoid short circuit, it is necessary to install circuit breaker
depending on the mounting location of the unit.
●
Do not place earth line near the following objects:
(1) Water pipe
(2) Gas pipe – There is danger of catching fire.
(3) The earth line of lightning conductor and telephone —
short circuit may occur during lightning.
Power Source
WARNING
!
●
Do not alter the plug of power cord.
Do not make extension to the power cord.
CAUTION
!
●
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
●
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into
the socket.
●
Keep additional length for the power cord and do not render
the plug under external force as this may cause poor
contact.
●
Do not fix the power cord with U-shape nail.
Operation Test
●
Please ensure that the air conditioner is in normal operating
condition during the operation test.
●
Explain to your customer the proper operation procedures
as described in the user’s manual.
Insulation material for pipe connection
Sleeve of
protection pipe
Putty
The controller must be hooked onto the hook at the lower
part of the holder. Push in the remote controller in the direction
as shown in figure below.
WARNING
●
You may not be able to close the side cover
due to the connecting cord, under such
situation, please press against the wait of
side cover to fix it.
●
Be sure that the hooks (2 places) are
plugged in.
Otherwise, water leakage may occur and this
causes short circuit or faults.
●
THIS APPLIANCE MUST BE EARTHED.
Procedures of Wiring
Wiring Of The Outdoor Unit
●
Please remove the side cover for wire connection.
WARNING
Power supply shall be connected at the rated voltage, otherwise the unit will be broken or could not reach the specified capacity.
Detail of cutting the connecting cord
To remove the connecting wires for
the indoor unit, please remove the low
cover panel in front of the unit.
!
!
How to Remove the Front Cover
●
Open the cover and remove the screw.
●
After open the front panel, remove the screw and open the
cover , disconnect the wire connector .
●
Remove the filter, release the axis by pulling the center portion of
front cover in the direction of arrow .
●
Push vertical air deflector handle to the right or left side.
●
After raise the front cover from bottom side as , release the front
cover by pull the right or left sides as .
How to Install the Front Cover
●
Insert the two hooks at the upper side certainly.
●
Open Front Panel, push the center down in the direction of the arrow
to insert the axis at the center of the front cover into the hook at the
outlet frame.
●
Connect the wire connetor , fixed the screw and cover and .
<
I957: A
>
Connection wire
is put under here
Side cover
Blue
ll
A
Brown
II
B
Connection wire
Screw for earth line
Indoor Unit
AC 220-240V
Outdoor Unit
Connecting Cord
Strip Wires
Indoor
Unit
Outdoor
Unit
GRN + YEL
GRN + YEL
B
A
B
A
Line Cord
Brown (L)
Blue (N)
Green & Yellow
2.0
45mm
10mm
30mm
10mm
10mm
70mm
35mm
A, B,
A, B,
Use 10A time delay FUSE
Connect the
earth cord
After remove the
screw and band,
put the connecting
cords and fix the
band with screw.
A
B
Wiring Of The Indoor Unit
●
For wire connection of the Indoor unit, you need to remove front panel and electrical cover.
Method to remove front panel
●
Refer to “How to Remove The Front Cover”.
Method to remove electrical cover
●
Remove the screw and electrical cover.
●
Insert the connecting cord (A, B) from the bottom of unit.
●
Fixed the wire to terminal wires firmly as shown in figure at right side.
AUTO
RESTART
SWITCH
Electrical cover
Screw
1
6
2
3
4
5
7
1
6
Screw
7
6
1
2
1
3
4
Screw
Cover
Front panel
Front Cover
Vertical Air Deflector Handle
5
5
1
1
2
2
7
INS RAS/RAC 10CE9S-EN(2)
18/11/05, 6:30 PM
1