~ 17 ~
C
A
10~15mm
D
B
安裝主支架
排水管
排水槽或
排水彎頭
外箱
● Water drainage elbow X1 ● Water trough X1 ● Caulking styrofoam plate X1 ● Installation bracket X1 ● Battery X2
● Rubber sleeve X1
● Caulking foam X1 ● Remote controller holder X1 ● Remote controller X1 ● Part bag X1
Perform a periodic check every half-a-year to a year or perform check when the usage season
Begins or ends according to the following key points. If there is any question or any error found,
please contact our service center or the dealer from where your air conditioner was purchased.
1
Check that there is no obstacle before the air inlet and outlet. Remove if any.
2
Check that the earth wire is firmly attached without being loose or dropped.
3
Check the installation bracket for any damage or rusting that may affect strength of
the installation bracket.
4
Check and clean the heat-exchanger to prevent clogging with dust, or it will affect
the cooling performance
Barrier
Above 500 mm
Above
Above
Wall
INSTALLATION DIMENSIONS
機
種
高(
mm
)
寬(
mm
)
深(
mm
)
R AV- 2 0 A L
8 6 0
4 0 0
2 9 8
R AV- 2 0 B P
8 6 0
4 0 0
2 9 8
R AV- 2 5 A S J
8 6 0
4 0 0
2 9 8
R AV- 2 5 S W
8 6 0
4 0 0
2 9 8
Wall
Water trough or
Water drainage elbow
Cabinet
Main
bracket
Water
drainpipe
ACCESSORY NAMES AND QUANTITIES
機
種
高(
mm
)
寬(
mm
)
深(
mm
)
R AV- 2 0 A L
8 6 0
4 0 0
2 9 8
R AV- 2 0 B P
8 6 0
4 0 0
2 9 8
R AV- 2 5 A S J
8 6 0
4 0 0
2 9 8
R AV- 2 5 S W
8 6 0
4 0 0
2 9 8
PERIODIC CHECK
機
種
高(
mm
)
寬(
mm
)
深(
mm
)
R AV- 2 0 A L
8 6 0
4 0 0
2 9 8
R AV- 2 0 B P
8 6 0
4 0 0
2 9 8
R AV- 2 5 A S J
8 6 0
4 0 0
2 9 8
R AV- 2 5 S W
8 6 0
4 0 0
2 9 8
Barrier
Barrier
500mm
500mm
Model
A
B
C
D
unit : mm
Dimension
Outdoor side installation distance
Outdoor side
Outdoor side
RA-08HV
620
435
335
95
RA-10HV
620
435
335
95
RA-15HV
620
435
335
95
RA-20HV
700
478
369
95
RA-23HV
700
478
369
95
Indoor side
Indoor side