![Hitachi N342555809 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/hitachi/n342555809/n342555809_installation-operation-and-maintenance_145400034.webp)
PV-250 Track Relay
Copyright 2019 SM 4574F, Rev. 4, March 2019
3-18
6. Perform an electrical calibration test in accordance with Section 3.2.2. If the
relay passes the In-service/Field Calibration requirements apply glyptal to the
exposed threads of the counterweight screw and trunnion locknut, as shown in
7. Install gaskets and covers and seal with a new wire and lead seal.
Figure 3-6. Inspecting Loose Counterweights and Loose Trunnion Screw
Locknuts
3.7.6. Test for Balanced Magnetic Circuit
With the relay standing on its back so that the vane hangs down with front and back
contacts open, apply normal voltage and frequency to the local winding. There should
not be any appreciable movement of the vane, particularly no tendency to close the
front contacts.
Содержание N342555809
Страница 2: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 ...
Страница 8: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 vi ...
Страница 16: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 2 6 ...
Страница 35: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 3 19 ...
Страница 36: ......
Страница 46: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 5 2 End of Manual ...