Travelstar 5K80 Hard Disk Drive Specification
27
6.3.6.4 Test considerations
Start/stop testing is classically performed to verify head/disk durability. The heads do not land on the disk, there-
fore this type of test should be viewed as a test of the load/unload function.
Start/Stop testing should be done by commands through the interface, not by power cycling the drive. Simple
power cycling of the drive invokes the emergency unload mechanism and subjects the HDD to nontypical mechan-
ical stress.
Power cycling testing may be required to test the boot-up function of the system. In this case Hitachi recommends
that the power-off portion of the cycle contain the sequence specified in Section 6.3.6.2, “Required Power-Off
Sequence” on page 26. If this is not done, the emergency unload function is invoked and nontypical stress results.
Содержание HTS548020M9AT00
Страница 2: ......
Страница 14: ...Travelstar 5K80 Hard Disk Drive Specification x ...
Страница 20: ...Travelstar 5K80 Hard Disk Drive Specification 6 ...
Страница 21: ...Travelstar 5K80 Hard Disk Drive Specification 7 Part 1 Functional specification ...
Страница 22: ...Travelstar 5K80 Hard Disk Drive Specification 8 ...
Страница 24: ...Travelstar 5K80 Hard Disk Drive Specification 10 ...
Страница 34: ...Travelstar 5K80 Hard Disk Drive Specification 20 ...
Страница 50: ...Travelstar 5K80 Hard Disk Drive Specification 36 ...
Страница 69: ...Travelstar 5K80 Hard Disk Drive Specification 53 Part 2 Interface specification ...
Страница 70: ...Travelstar 5K80 Hard Disk Drive Specification 54 ...
Страница 72: ...Travelstar 5K80 Hard Disk Drive Specification 56 ...
Страница 74: ...Travelstar 5K80 Hard Disk Drive Specification 58 ...
Страница 102: ...Travelstar 5K80 Hard Disk Drive Specification 86 ...
Страница 108: ...Travelstar 5K80 Hard Disk Drive Specification page 92 ...
Страница 209: ...Travelstar 5K80 Hard Disk Drive Specification 193 ...
Страница 210: ...Travelstar 5K80 Hard Disk Drive Specification 194 ...