
9
HAS-WM05
4
Attach the M10 x 162mm arm vertical adjustment screws (L) to the base
bracket assembly (A) up to the red mark.
5
Mount the arm assembly (A) on the base bracket assembly.
Red mark
Red mark
M10 x 152mm Arm vertical
adjustment screw (L)
Arm assembly
(
A
)
Base bracket assembly
Arm assembly
(
A
)
Temporarily suspend the arm
assembly (A) from the screws.
Screw
Hook the groove of the screw on
the U-shape of the base bracket
assembly.
⑤-1
⑤-2
8
HAS-WM05
2
Loosen the fastening screw (in the location indicated by the arrow in the
diagram below) and extend the arm bracket (IN). Attach the adjustment block
(D) to the arm bracket (IN).
3
Attach the adjustment block (D) to the arm bracket with four M4 x8mm
hex-head screws (J). Align with the projection screen size and attach to the
position as indicated in the diagram.
Tightening torque: 0.98 N•m (10 kgf•cm)
CAUTION
■
Assemble the adjusting block (D) according to projection screen size.
Projection screens smaller than 70 inches
Projection screens 70 inches or larger
Note:
Face the knobs of the adjustment block (D) in the
directions shown in this diagram.
Arm bracket (IN)
Adjusting block (D)
Fastening screw
Arm bracket (IN)
Arm bracket (IN)
Adjusting block (D)
*Far side of arm bracket (IN)
Adjusting block (D)
*Near side of arm bracket (IN)
M4 × 8 hexagon head
screws (J) (Four places)
M4 × 8 hexagon head
screws (J) (Four places)