
4
/
8
WIRING CONNECTION
2. Fixing Method by Screw(M4) (Screws: Field-supplied)
By using screw (M4 Screw, 4Position), fix HARC-BX E on the wall.
4
WIRING CONNECTION
Read and understand SAFETY SAMMARY as described in the beginning of this manual
before starting up wiring work.
■
Wiring work should perform according to”the local regulations” and the instruction of
utility company beforehand.
■
Wiring work should be perfomed by qualified electrician.
■
Electircal leakage breaker should be porvided according to “the local regurations”.
4.1.
Wiring
1. Wiring work of Power supply Wiring for HARC-BX E, transmission cable between
packaged air conditioners, and transmission cable between upper monitoring
equipment are required for HARC-BX E.
Содержание HARC-BX E
Страница 2: ......
Страница 183: ......
Страница 184: ...P5413784 PMML0077A rev 4 01 05 Printed in Japan ...