•
Pair condition and recovery: P-VOL failure (LDEV blockade) on page 6-11
•
Pair condition and recovery: S-VOL failure (LDEV blockade) on page
•
Pair condition and recovery: full pool for the P-VOL on page 6-19
•
Pair condition and recovery: full pool for the S-VOL on page 6-22
•
Pair condition and recovery: path failure from the primary to secondary
•
Pair condition and recovery: path failure from the secondary to primary
•
Pair condition and recovery: primary system failure on page 6-29
•
Pair condition and recovery: secondary system failure on page 6-31
•
Pair condition and recovery: path failure from the primary to external
•
Pair condition and recovery: path failure from the secondary to external
•
Pair condition and recovery: quorum disk failure on page 6-39
•
Pair condition and recovery: external system failure on page 6-45
•
Pair condition and recovery: other failures on page 6-46
SIMs related to GAD
The following table shows SIMs related to global-active device operations. All
SIMs in the following table are reported to the service processor (SVP) of the
storage system.
SIM reference
code
Description
2180XX
Logical path(s) on the remote copy connections was logically
blocked (Due to an error conditions)
21D0XX
External storage system connection path blocking
21D2XX
Threshold over by external storage system connection path
response time-out
3A0XYY
LDEV Blockade (Effect of micro code error)
622XXX
The DP POOL FULL
DD0XYY
GAD for this volume was suspended (Due to an unrecoverable
failure on the remote copy connections)
DD1XYY
GAD for this volume was suspended (Due to a failure on the
volume)
DD2XYY
GAD for this volume was suspended (Due to an internal error
condition detected)
DD3XYY
Status of the P-VOL was not consistent with the S-VOL
DEE0ZZ
Quorum Disk Restore
6-6
Disaster recovery of global-active device
Hitachi Virtual Storage Platform G1000 Global-Active Device User Guide
Содержание G1000
Страница 8: ...Index viii Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 14: ...xiv Preface Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 60: ...2 22 System requirements Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 80: ...3 20 Planning for global active device Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 128: ...4 48 Configuration and pair management using CCI Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 238: ...9 18 Troubleshooting Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 245: ...Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...