MAINTENANCE
7-64
Table 2. Lines
Interval(hours)
Check Points
Abnormalities
Remedies
Daily
Contact surfaces of
flange joints
Welded surfaces on
joints
Clamps
Leak (11)
Leak (12)
Loose
Replace
O-ring
and/or
retighten bolts
Replace
Retighten
Every 250 hours
Welded surfaces
on joints
Clamps
Crack (13)
Missing
Deformation
Replace
Replace
Replace
NOTE: Refer to the illustrations in Fig.2 for each check point location or for a descrip-
tion of the abnormality. Use genuine Hitachi parts.
Table 3. Oil cooler
Interval(hours)
Check Points
Abnormalities
Remedies
Every 250 hours
Contact surfaces of
flange joints
Oil cooler
Leak (14)
Leak (15)
Replace
O-ring
and/or
retighten bolts
Replace
NOTE: Refer to the illustrations in Fig.3 for each check point location .
M115-07-150
Fig. 2
M115-07-151
Fig. 3
11
13
12
14
15
14
Содержание EX1900-5
Страница 1: ......
Страница 37: ...SAFETY SIGNS S 29 SS 411 SS 691 SS 442 M18C 01 006 SS 445 M144 07 107 ...
Страница 38: ...SAFETY SIGNS S 30 SS 446 SS 723 SS3076117 SS 723 SS 410 SS 723 Loading Shovel ...
Страница 39: ...SAFETY SIGNS S 31 SS3091476 M146 01 035 ...
Страница 40: ...SAFETY SIGNS S 32 SS 413 M18C 01 007 M18C 01 008 ...
Страница 42: ...SAFETY SIGNS S 34 MEMO ...
Страница 112: ...DRIVING THE MACHINE 4 12 MEMO ...
Страница 140: ...MAINTENANCE 7 8 MEMO ...
Страница 146: ...MAINTENANCE 7 14 Hoses Q ty in Use Transmission Oil Cooler Hose 5 2 M18C 07 062 5 ...
Страница 156: ...MAINTENANCE 7 24 4 Grouped Grease Fittings 7 Arm Ñ Lubrication M144 07 079 M144 07 005 7 ...
Страница 158: ...MAINTENANCE 7 26 Grease Fittings for Bucket and Link Pins Auto lubrication system equipped M18C 07 072 VIEW B VIEW A ...
Страница 258: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Страница 274: ...TROUBLESHOOTING 11 14 MEMO ...
Страница 278: ...SPECIFICATIONS 12 4 MEMO ...