52
CP-X205W (C14-20N) / CP-X305W (C14-25N)
a. Tighten 7 screws on the bottom and 2 screws on the rear after attaching the upper case with the lamp
door separated.
In order not to make a gap between the upper and the bottom cases, tighten these screws while pressing
down the upper case in the direction of the arrow. Be careful not to bend the outside casing.(Torque:0.39-
0.59N•m)
When assembling
b. Attach the Lamp door.
CAUTION
Tighten this screw using a manual screwdriver.
CAUTION
These are not screw holes. Do NOT insert a
screw or screwdriver into them to avoid damag-
ing the inside.
Lamp door
Содержание CP-X205W(C14-20N)
Страница 49: ...49 CP X205W C14 20N CP X305W C14 25N 8 Disassembly diagram ...
Страница 50: ...50 CP X205W C14 20N CP X305W C14 25N ...
Страница 74: ...74 CP X205W C14 20N CP X305W C14 25N MEMO ...
Страница 75: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT BALLAST 1 CONFIDENTIAL ...
Страница 76: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT BALLAST 2 CONFIDENTIAL ...
Страница 77: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G POWER UNIT CIRCUIT CONFIDENTIAL ...
Страница 91: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G PWB assembly NETWORK 1 CONFIDENTIAL ...
Страница 92: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G PWB assembly NETWORK 2 CONFIDENTIAL ...
Страница 93: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G PWB assembly NETWORK 3 CONFIDENTIAL ...
Страница 94: ...CP X205W C14 20N CP X305W C14 25N 1 2 3 4 5 6 1 2 3 4 5 6 A B C D E F G PWB assembly NETWORK 4 CONFIDENTIAL ...
Страница 96: ...QR72981 Printed in Japan JE CP X205W CP X305W YK No 0591E ...