--- 11 ---
(3) Disassembly of the base ass'y (Fig. 3)
1 Remove the Retaining Ring (E-Type) For D8 Shaft
[52]
to remove the Link Lever
[51]
. Loosen the
Special Bolt M6
[53]
and remove the Washer M6
[50]
.
2 Pull out the Roll Pin D6 x 36
[48]
which connects the Gear Cover
[41]
and the Base
[49]
.
Fig. 3
[49]
[48]
[41]
[53]
[52]
[50]
[51]
(4) Disassembly of the Bearing Holder
[37]
(Fig. 4 and Fig. 5)
1 Loosen the two Seal Lock Screws (W/Sp. Washer) M5 x 20
[47]
. Tap gently the end surface of the
Gear Cover
[41]
with a wooden hammer and remove the Bearing Holder
[37]
in an assembled
condition.
2 Pull out the O-ring
[33]
attached to the tip of the Spindle
[38]
and push the end surface of the Spindle
[38]
with a hand press holding the side of the Bearing Holder
[37]
. Then the Distance Piece
[35]
and
the Spindle
[38]
can be removed in an assembled condition.
Fig. 4
[35]
[33]
[37]
[37]
[41]
[47]
[38]
[33]
[38]
[34] [35]
[36]
Jig
Push
Fig. 5
60 mm
38 mm
Содержание CM 4SB2
Страница 25: ......