
TRANSPORTATION AND HANDLING
5
ENG
L
IS
H
2.3.
NECESSARY TOOLS AND INSTRUMENT LIST FOR INSTALLATION
No.
Tool
No.
Tool
1
Handsaw
11
Spanner
2
Phillips Screwdriver
12
Charging Cylinder
3
Vacuum Pump
13
Gauge Manifold
4
Refrigerant Gas Hose
14
Cutter for Wires
5
Megohmmeter
15
Gas Leak Detector
6
Copper Pipe Bender
16
Leveler
7
Manual Water Pump
17
Clamper for Solderless Terminals
8
Pipe Cutter
18
Hoist (for Indoor Unit)
9
Brazing Kit
19
Ammeter
10
Hexagon Wrench
20
Voltage Meter
3.
TRANSPORTATION AND HANDLING
Transport the product as close to the installation location as practical before unpacking
Ô
WARNING:
Do not put any foreign material into the CH Unit and check to ensure that none exists in the
outdoor unit before the installation and test run. Otherwise, a fire or failure, etc. may occur.
Ó
CAUTION:
Do not put any material on the product.
Be careful not to damage on insulation materials of unit’s surface when lifting.
3.1.
COMBINATION CH UNIT AND INDOOR UNIT
The CH Unit is Installed indoors for the SET-FREE FXN(E) system, between the outdoor unit and
Indoor unit. The combination of the CH Unit and indoor Unit is as follows.
Model
Indoor Unit Quantity
Total Indoor Capacity (HP)
CH-4.0NE
1 to 5
Smaller than 4.0
(excluding 4.0)
CH-8.0NE
1 to 8
4.0~8.0 (including 4.0
and excluding 8.0)
CH-12.0N
1 to 5
8.0~12.0 (including 8.0
and including 12.0)
Содержание CH Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 70: ......
Страница 86: ......
Страница 102: ......
Страница 118: ......
Страница 134: ......
Страница 150: ......
Страница 167: ......
Страница 168: ...P5413812 PMML0108A rev 0 05 05 ...