![Hitachi APCQ Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/hitachi/apcq/apcq_installation-operation-and-maintenance-instructions_146094025.webp)
APCQ CAPACITOR BANKS
STATUS
Approved
SECURITY LEVEL
Public
DOCUMENT ID
9AKK107680A4136
REV.
E
LANG.
en
PAGE
25/47
© 2022 Hitachi Energy. All rights reserved.
6. Options
6.1. Optional RVT controller
For voltage ≤ 440V, RVT can be ordered as an option.
Above 440V, RVT is provided by default.
RVT controller offer a wider screen and advance features.
RVT must be ordered if communication and remote control are required.
Please refer to RVT manual for exhaustive information.
6.2. APCQ-M and APCQ-R electrical connections – Top entry (optional)
A top entry is possible and can be ordered as an option.
– Unscrew aluminum cover (3 mm thickness) of the cubicle and pass all cables through,
– Connect earth (see
– Connect power cables to busbar,
– For all other connections: please refer to previous sections.
Figure 29: APCQ-M and APCQ-R top cables entry
6.3. Optional Circuit breaker or OT isolator switch connections
If a circuit breaker or an OT isolator switch is ordered, it is located in the center of the cabinet as per below picture
(standard design) and their door handles are located in the middle of the front door panel. The power terminals for
cables connections are connected bottom – by default or top (optional) as per below figures.
Inside the cable entry cabinet, the circuit breaker or OT switch is also located in the middle of the front door cabinet
and cables have to be connected directly the their power terminals – see