Number
Item
1
Pin for square holes
2
Pin for round holes
Before you begin
■
Make sure the rack is secure and cannot fall over.
■
Make sure the rack has at least two PDUs installed.
■
Verify that all power cables are removed from the AC power receptacles on the rear of the
controller.
■
Install the rack stabilizers before mounting the storage system in the rack.
Procedure
1.
Attach stopper with three screws on the rear side of the rail. Repeat step for both rails.
Step 3: Install the controller into the rack
Installing your storage system
Hitachi Virtual Storage Platform E990 Installation Guide
6