85
1 、 Clean Ball Head and Rubber Sheath ,then inject 40%
Lithium Lubrication and place in the Rubber Sheath.
2、Clean the liner pipe of the Shaft Arm, nylon bush and
collar pipe, then press nylon bush into liner pipe and
fill up collar pipe with lithium lubrication.
3、Fix Shaft Arm onto the Frame with M10 Bolt. (Figure
4-6-12).
Figure 4-6-12
1.Front Upper Shaft Arm 2.Front Lower Shaft Arm
4、Mount Turning Joint onto Shaft Arm with M10 Open-groove
Nut.
5、Fix Tension Rod onto Turning Joint with M10 Open-groove
Содержание 450ATV-2
Страница 1: ...450ATV 2 Maintenance Manual ...
Страница 3: ......
Страница 10: ...10 4 1 Steering system Structure of Steering Vertical Column Components of Steering Bar ...
Страница 11: ...11 4 1 1 Disassembly inspection and assembly of Steering System ...
Страница 59: ...59 1 Height no less than 3mm 2 profile depth Figure 4 3 4 4 4 Transmission System Rear Bridge ...
Страница 76: ...76 Pan Fork ...
Страница 77: ...77 4 6 1 Disassembly Maintenace and Assembly of Front Suspension ...
Страница 105: ...105 damaged 3 routing wire carve out a way or short circuit replace replace or repair 5 ignition system ...