![Hirschmann MACH 1020 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/hirschmann/mach-1020/mach-1020_user-manual_2138010029.webp)
Installation MACH1000
Release 02 03/2013
29
2 Assembly and start-up
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
Unpacking and checking
Installing the SFP transceivers (optional)
Connecting the power unit connections for supply voltage and
signal contact
Installing the device
Startup
Connecting the data lines
2.1
Installing the device
2.1.1
Unpacking and checking
Check whether the package includes all items named in chapter “Scope
of delivery” on page 58.
Check the individual parts for transport damage.
2.1.2
Installing the SFP transceivers (optional)
Figure 7: Fast Ethernet / Gigabit Ethernet Fiberoptic SFP Transceiver
Before attaching an SFP transceiver, first remove the protective cap over
the socket.
Push the SFP transceiver with the lock closed into the socket until you
hear it latch in.
Note:
Only use Hirschmann SFP transceivers
(see page
59 “Accessories”
)
.
Содержание MACH 1020
Страница 4: ...4 Installation MACH1000 Release 02 03 2013...
Страница 61: ...Installation MACH1000 Release 02 03 2013 61...
Страница 62: ...62 Installation MACH1000 Release 02 03 2013...
Страница 64: ......