
30
Measurement Workflow
1.4
Measurement Workflow
Before using the device, be sure to review the “Usage
Notes” (p. 5) and operating procedures.
Preparation for Measurements
Connecting the device to the power supply. (p. 35)
1
Verify that the 3269 or 3272 is turned off and connect the
power cord to the AC electrical outlet.
2
Lock the device’s sensor head.
3
Connect the power plug of the device to the 3269 or the 3272.
4
Turn the 3269 or the 3272 power switch on.
5
Wait at least 30 minutes after turning on the device.
Performing Demagnetizing and Zero-Adjustment. (p. 37)
1
Adjust the waveform measurement instrument’s zero
position and set its input coupling.
Содержание CT6700
Страница 2: ......
Страница 4: ...ii Contents...
Страница 69: ...16 01 EN...
Страница 70: ......
Страница 71: ......
Страница 72: ......