Once the case is properly placed on the shim packs,
check the vertical plumb of the case by placing a bubble
level on the rear wall. Add/remove shim packs as needed.
For the horizontal level, repeat this process after placing
the bubble level on the front sill.
3.
Install the bumper, if applicable, into pre-attached bumper
track and snap into place. (Most self-contained cases ship
with bumper pre-installed.)
4.
After suffi cient time has passed to allow for bumper
shrinkage, cut away the excess bumper for fi nal fi t and fi n-
ish. Be certain to use an appropriate cutting tool (tubing-
or PVC-cutter) to ensure a smooth cut.
5.
Install case shelves and reconnect lights. Be aware that
differing shelf confi gurations will affect energy consump-
tion and case performance.
6.
Install toekick/compressor compartment access panel
back onto the base of case, if applicable.
C A U T I O N
These cases are not designed for excessive
external weight. Do not walk on top or inside
of cases. Doing so may result in case damage
and/or personal injury.
▲
LINE-UP & INSTALLATION
Single Case
1.
Move the case into position. Using a “J” bar, raise the end
of the case (under cross support), and lower the horizontal
support on to the shim packs. Repeat on the other end of
the case.
Fig. 4 Seismic anchoring locations (caster brackets)
BRACKET
Fig. 3 Seismic anchoring locations (sled runners)
9.
(CASTERS) If necessary, attach two brackets at two sepa-
rate corners of the case (Fig. 4) and fasten to the fl oor
with concrete anchors.
Note: The brackets do not need to
be affi xed in the exact locations specifi ed here. Howev-
er, be sure that the anchors are close to the corners and
that at least two brackets are used, one at each corner.
You can use more than two brackets for anchoring if you
want further support this way.
W A R N I N G
Be certain that your hands and feet are out of
the way before lowering the case. Failure to do
so may result in serious injury.
▲
C A U T I O N
Locate the horizontal or vertical (caster) sup-
ports under unit before removing from pallet.
Failure to do so will damage the fi nished metal
if correct lift points are not identifi ed prior to
removal.
▲
C A U T I O N
Do not obstruct vetilation around the base of
the display case condensing unit. Obstructing
could cause the case to not operate correctly
and failure to maintain product temperatures.
▲
CASE INSTALLATION
10
Содержание OB-SC R-290 PRODUCE
Страница 2: ...ii ...
Страница 4: ...Revision History new manual format_09 20 NSF Listing Update_12 20 iv ...
Страница 26: ...A1 WIRING DIAGRAM TBD ...