8
LINE UP
4
Level Floor. Use Laser Transit
Leveling is necessary to assure prop-
er case alignment. Locate highest
point on chalk line as reference for
determining height of shim-pack
levelers. A laser transit is recommend-
ed for precision and requires just one
person.
1
5
Consult With General Contractor
Ask the general contractor if there
have been changes in the building
dimensions since the print you are
using was issued. Also, ask the
points of reference from which you
should take dimensions to locate the
cases.
Set Shims On Joint Locations
Locate case joint positions along
chalk lines. Spot shim packs at each
joint location and at each base horse
between the joints.
2
Snap Chalk Lines
Mark floor where cases are to be
located for the entire lineup.
3
S n a p L i n e s O n B a s e R a i l
Locations
Snap lines where base rails are posi-
tioned, not the front or back edges of
the cases. See case cross section
drawing, pages 4-6, for rail location
dimensions.
6
Position First Case In Lineup and
Level
Move first case into position. Raise
case from end under cross support
using “J” bar and remove the casters
[CAUTION! Keep hands from under-
neath case] Level case on shims.
BASE RAIL
BASE RAIL
Содержание ORIGIN2 ONIZ
Страница 2: ......
Страница 4: ......
Страница 6: ...2...
Страница 19: ...15 WIRING DIAGRAMS MODEL ONIZ 6...
Страница 20: ...16 WIRING DIAGRAMS MODEL ONIZ 8...
Страница 21: ...17 WIRING DIAGRAMS MODEL ONIZ 10...
Страница 22: ...18 WIRING DIAGRAMS MODEL ONIZ 12...
Страница 28: ...24 PARTS ORDERING 18 1 26 2 17 3 30 5 14 48 12 15 9 E01 24 11 6 31 MODEL ONIZ 37 69 74 59 73 E09 E11 E10 E20...