![High Voltage PFT Series Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/high-voltage/pft-series/pft-series_safety-operation-and-procedure-instructions_2130374009.webp)
6
SETTING UP THE EQUIPMENT
The setup of this equipment has been minimized by careful consideration of the operator during design. The
PFT Series’ one-piece construction (50kV and below) minimizes misplaced components while allowing for
convenient portability.
1.
Select a location
for the unit that will allow easy viewing of the meters at a safe distance
from the test object.
2.
Be sure that all the controls are off
,
in their de-energized or fully counterclockwise
position.
3.
Secure a ground test lead to the panel
.
The
Ground
post on the front panel should be
used for that purpose. A black test lead with black boot has been provided for the ground
connection. A second ground lead is provided for two-piece units for the grounding of the high
voltage section.
4.
Insert the EXT INTLK plug into the socket on the panel.
The plug may also be
wired to a normally open contact of a safety switch for added protection. Hand-held safety
switches are available from High Voltage to plug directly into the EXT INTLK socket.
5.
If applicable, connect the interconnect cable between the control and high
voltage section.
6.
The red booted alligator clamp on the output cable is used to connect the output cable to the test
object. (50kV and below). Connection of the output toroid on the PFT-1003 high voltage section
to the load is accomplished by using a customer provided test lead or tubing (metallic) between
the toroid (HV output) and test object.
SECTION
2
Содержание PFT Series
Страница 2: ...OperatorManual ...
Страница 14: ...11 THIS PAGE LEFT BLANK FOR APPLICATION NOTES ...
Страница 27: ......
Страница 28: ......
Страница 29: ......