09
TO START
Make sure you have a clear space, remember when finished and in place you need access to check your build and
able to pull the shower out for servicing or should you have the need to replace anything!
Take the shower tray and remove all the protective wrapping and fit the waste. If you purchased the fitting kit it is
possible this may have already been fitted in the tray hole yet please note this is only for transportation reasons
therefore you will still need to ensure the correct sealing and alignment is carried out. In the side of the waste
supplied in the optional fitting kit you will notice a spigot not seen on an ordinary waste. In most cases this is blanked
yet should you have a steam version you need to gently drill this out as this item is for the steam generator drainage
and will be connected in the instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit level, adjust the tray feet
accordingly. Once you are happy with the levelling of the tray, you can pull it out to begin the main construction.
Step 1
Attach the small hand back panel to the back column.
Once you are happy with the alignment, run a bead of silicone up the
edge and along the bottom of the panels and screw together using
the
ST20
(please note, if your column has a rubber seal at the bottom , take the rubber
off and apply silicone inside the rubber and replace)
Содержание GT-0532
Страница 1: ...INSTALLATION MANUAL GT 0532 ATTENTION INSTALLERS These instruc ons must be le with the customer ...
Страница 3: ...03 ...
Страница 17: ...17 Electric Box Connections Speaker Bluetooth USB Back Lights ...
Страница 24: ...24 ...