![HIAB X-Duo 044 Скачать руководство пользователя страница 96](http://html.mh-extra.com/html/hiab/x-duo-044/x-duo-044_operators-manual_2129125096.webp)
➁
➀
➂
96
Maintenance and Service
Operator's Manual GB
8.3.8
Install a new rope
1. Guide the rope through the top roller and
the rope guide/s.
2. Insert the rope end through the rope inlet
③
into the rope wedge
②
. Insert both in
the rope pocket
①
.
Pay attention, that the rope with rope
wedge are perfectly clamped in the rope
pocket.
3. Spool on the rope.
In order to achieve a high spooling quality
and durability the rope always has to be
spooled on with a minimum hook load
according to the following table.
Hoist type
Minimum hook
load
TC1
40 - 80 kg
TC2 / TC2L
70 -140 kg
TC3
150 -300 kg
TC5
200 -400 kg
As a basic rule we recommend ~ 5% of the
hoist load capacity.