Maintenance and Service
Operator's Manual GB
8.3.1
Add-on equipment and separate accessories
(hoist etc.)
• Check the cables, cable connections, the cable
guides and the attachment points for the add-
on equipment.
• Maintain all add-on equipment, separate ac-
cessories, auxiliary equipment etc. according
to the instructions supplied with it.
Hoist
• Visual check of the rope. In the event of
damage to the rope, see the rules how to
handle this in section: Check rope.
• Check cables, cable connections, rope guides
and the attachment points.
• Polyamid parts as well as all bolt components
have to be checked and must be replaced in
case of wear and tear.
Electronic components
• Check that these are in good condition.
• LED test
To do the test:
1. Push the ON/OFF button for at least 2 sec.
The test is activated and all the red LEDs
are illuminated.
If the system is equipped with warning
lights / lamp pole, lamps will come on.
2. Release the button. After 3 sec, all the
green the LEDs are illuminated. The test is
finished when all LEDs is extinguished.