The below tables show the impact of a GNSS outage on a fully converged PPP position, highlighting different
outage durations and the corresponding drift in accuracy values.
IMU-ISA-100C
– GNSS Outage Performance
Outage
Duration (Secs)
Position Accuracy
(M) RMS
Velocity Accuracy
(M/S)
Attitude Accuracy
(Degrees) RMS
Horizontal Vertical Horizontal Vertical
Roll
Pitch
Heading
0
0.06
0.15
0.008
0.008
0.006
0.006
0.010
10
0.12
0.20
0.013
0.013
0.008
0.008
0.013
60
0.96
0.65
0.048
0.023
0.009
0.009
0.018
IMU-µIMU-IC
– GNSS Outage Performance
Outage
Duration (Secs)
Position Accuracy
(M) RMS
Velocity Accuracy
(M/S)
Attitude Accuracy
(Degrees) RMS
Horizontal Vertical Horizontal Vertical
Roll
Pitch Heading
0
0.06
0.15
0.015
0.010
0.010
0.010
0.030
10
0.16
0.23
0.035
0.015
0.017
0.017
0.038
60
3.56
0.90
0.165
0.022
0.025
0.025
0.050
IMU-ISA-100C
&
IMU-µIMU-IC - Heave
The table below shows the Heave performance for three scenarios, applicable to both models of IMU.
Scenario
Heave Performance
cm
%
Instantaneous Heave
5
5%
Delayed Heave
3.5
3.5%
Post-Processed Heave
2.5
2.5%