
28
site examination,
site humidity,
site temperature,
troubleshooting router installation,
verifying installation,
interface
cable installation,
power cord connection,
L
LED
LED description,
power-on check,
technical specifications,
lightning
protection,
M
mounting
router on workbench,
N
network management
router installation,
troubleshooting router installation,
no response from serial port (troubleshooting),
P
parameter (console terminal),
PoE
supplying power to terminals,
port (troubleshooting no response),
power cooling requirements,
power supply
troubleshooting failure,
powering on (router),
power-on check,
pre-installation checklist,
preparing for installation,
preventing
EMI prevention,
procedure
configuring basic settings for router,
grounding router with buried grounding
conductor,
grounding router with grounding strip,
grounding the router,
installing interface cable,
installing
SD
installing the router,
mounting router on workbench,
powering on the router,
restoring factory settings,
setting console terminal parameters,
startup process,
troubleshooting garbled terminal display,
troubleshooting no response from serial port,
troubleshooting power supply failure,
R
reset button
usage guidelines,
S
safety
caution and warning symbols,
electrical safety recommendations,
ESD prevention,
general recommendations,
installation recommendations,
installation site cleanliness,
installation site dust concentration,
installation site gas saturation,
installation site humidity,
installation site temperature,
lightning protection,
setting console terminal parameters,
site
cleanliness,
cooling requirements,
dust concentration,
gas saturation,
startup process,
T
technical specifications,
LED,
,
temperature
installation site requirements,
site cooling requirements,
terminal
setting console parameters,
troubleshooting garbled display,
tools (installation),