
19
The mounting pegs should rest at the bottom
of the keyholes when the cladding has been
positioned correctly.
Install all the panels in the bottom row before
starting on the second row of cladding stone.
Start by mounting the cladding stone to the
right of the door and work around the oven.
The soapstone panels have no fixed top or bot-
tom, leaving you free to orient them how you
wish.
Fourteen cladding stone panels (E) are needed
for the Scan-Line 80 XL.
These panels can be arranged however you
want, as the same type of cladding stone panels
are used on the opposite side of the stove.
The panels will most likely require minor adjust-
ment after installation (as soapstone is a natu-
ral stone, and there is a high tolerance in the
production process for ceramic panels). Do this
by pushing the soapstone/ceramic panels side-
ways until the distances between the cladding
stones are equal.
Only sideways adjustment is possible.
E
E
E
E
E
E
E
C
D
scan-line 80 Xl
Содержание SCAN-LIINE 80 XL
Страница 18: ...18 scan line 80 Xl and scan line 80 XlB ...
Страница 28: ...28 ...