-
21
-
The timing requirements of GPS PPS and GPS Serial Data (NMEA) are shown below:
PPS cycle
t3 = 1 s ±50 μs (rising edge to rising edge)
PPS pulse width
t1 ≥ 1 ms (10 to 100 ms recommended)
Timing relationship
NMEA signal starts after the PPS rising edge of the current second, and ends after the PPS falling edge of the current
second, as shown by the gray arrows in figure above.
NMEA signal ends before the PPS rising edge of the next second; t2 ≥ 100 ms.
NMEA
PPS
1
0
t1
t2
t3
Содержание Pandar40M
Страница 1: ...www hesaitech com HESAI Wechat Pandar40M 40 Channel Mechanical LiDAR User Manual...
Страница 17: ...15 2 Setup 2 1 Mechanical Installation Figure 2 1 Front View Unit mm...
Страница 18: ...16 Figure 2 2 Bottom View Unit mm...
Страница 19: ...17 2 1 1 Quick Installation Figure 2 3 Quick Installation...
Страница 20: ...18 2 1 2 Stable Installation Figure 2 4 Stable Installation...
Страница 27: ...25 2 3 2 Connection Figure 2 10 Connection Box Connection with GPS...
Страница 28: ...26 Figure 2 11 Connection Box Connection with PTP...