I
NSTALLATION AND
A
SSEMBLY
19
No
.
HLS1200-61
Description
Material requirements
6
Run in cantilever
2x
Cantilever HLS1200-11
7
Run lifting platform in
the upper end position.
(Operator control
module: Open stopcock
/ hand-operated lever in
the switch position „on“).
8
Screw together
cantilever with the
platform main body.
6x
Hexagon screw M12x40
6x
Nut M12
12x
Ring washer 13mm
Important:
Put in the screws by yourself!!!
9
Install roll-off protection /
stop side
(Notice running
direction).
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Ring washer 10.5mm
10
Ramps holder /
running side.
(Notice running
direction).
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Ring washer 10.5mm
Содержание K1200-HLS-61
Страница 2: ...2 ...
Страница 42: ...ADDITIONAL INFORMATION 42 Dimensions installation pit HLS1200 64 66 ...
Страница 43: ...ADDITIONAL INFORMATION 43 Dimensions substructure HLS1200 64 66 ...
Страница 44: ...ADDITIONAL INFORMATION 44 Schematic diagram installation HLS1200 64 66 ...
Страница 45: ...ADDITIONAL INFORMATION 45 Dimension sheet HLS 1200 61 ...
Страница 46: ...ADDITIONAL INFORMATION 46 Dimension sheet HLS 1200 64 66 ...