I
NSTALLATION AND
A
SSEMBLY
17
No
.
HLS1200-11
Description
Material requirements
6
Run in cantilever
2x
Cantilever HLS1200-11
7
Run lifting platform in
the upper end position.
(Operator control
module: Open stopcock
/ hand-operated lever in
the switch position „on“).
8
Screw together
cantilever with the
platform main body.
6x
Hexagon screw M12x40
6x
Nut M12
12x
Ring washer 13mm
Important:
Insert screws from the inside!
9
Install roll-off protection /
stop side
(Notice running
direction).
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Washer 10.5mm
10
Ramps holder /
running side.
(Notice running
direction).
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Washer 10.5mm
Содержание HLS 1200-11
Страница 40: ...ADDITIONAL INFORMATION 40 Dimensions Installation Pit HLS1200 14 16...
Страница 41: ...ADDITIONAL INFORMATION 41 Dimensions Substructure HLS1200 14 16...
Страница 42: ...ADDITIONAL INFORMATION 42 Schematic Diagram Installation HLS1200 14 16...
Страница 43: ...ADDITIONAL INFORMATION 43 Dimension Sheet HLS 1200 11...
Страница 44: ...ADDITIONAL INFORMATION 44 Dimension Sheet HLS 1200 14 16...