
1-7. REPLACEMENT OF
ROD END BEARING
To avoid electrical shock or property damage, move the power
switch to OFF and disconnect main circuit breaker, or unplug
cord at wall receptacle.
1. Remove all equipment from top of unit.
2. Remove top (28) by lifting from unit.
3. Remove two screws (17) from cover plate assembly (16) and slide
assembly out towards the sifter basket.
4. Turn mandrel shaft (52) until eccentric (49) and rod end bearing
(46) are accessible.
5. Remove shoulder screw (51), nut and washers (48-43), and allow
rod end bearing (46) and push rod assembly (44) to fall free.
6. Remove spring retainer (38) and lift push rod (44) off basket holder
(39).
7. Remove push rod assembly from unit and measure the distance
from the end of the rod end bearing (46) to the locking nut (45).
8. Using two 9/16” wrenche, loosen locking nut (45) and unthread rod
end bearing from push rod (44).
9. Install locking nut (45) to new rod end bearing in same position as
old rod end bearing.
10. Snug locking nut and install push rod assembly to basket holder
(39) and eccentric (49), and tighten with 9/16” wrench.
203 1-5
Содержание HB-11
Страница 1: ...Henny Penny Hand Breader Sifter Model HB 11 TECHNICAL MANUAL...
Страница 9: ...1 10 WIRING DIAGRAMS 203 1 7...
Страница 12: ...EXPLODED VIEW OF HB11 HAND BREADER SIFTER 206 2 2...