![HENN I19-10 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/henn/i19-10/i19-10_assembly-instructions-manual_2124047016.webp)
01
G
A
A
G
02
Para
fi
xação da lateral inferior (02)
na travessa estrutural (05) deve ser
feita as furações.
For
fi
xing the lower side (02) on the
structural cross member (05)
drills must be made.
Para la
fi
jación del lateral inferior
(02) en el tramo estructural (05) se
deben realizar las perforaciones.
ITM/I19-
10
11
A: 2x
G: 2x
14
Содержание I19-10
Страница 12: ...ITM I19 6 10 11 A A A A A 4x 10 ...