READ BEFORE INSTALLATION:
※
Each panel is heavy. Be careful to avoid injury when installing, especially the top panel.
※
Two adults are required for the installation of sauna room.
※
There are metal plates with pins or a slots on the sides of each panel. They will be interlock
the panels together. The panel with the slot should be lifted up about 4 inches (10cm) higher
than the panel with the pin (Refer to Picture 1); place the slot panel against the panel with pin
(Refer to Picture 2),and then slide down the panel until the two panels are equal in height
(Refer to Picture 3). If they are not equal in height or there is an obvious gap between the
two panels, that means they are not properly attached, and you should try again.
The panels should be installed in the following order:
※
Floor Panel
→
Back Panel
→
Left Side Panel
→
Right Side Panel
→
Bench Support Panel
→
Bench Surface Panel
→
Front Panel
→
Top Panel
IG 630-EX/E300-X-3
4
09/18/09
Содержание IG-630 E300-X
Страница 4: ...PARTS NAMES Vent IG 630 EX E300 X 3 3 09 18 09...
Страница 10: ...INSTALLATION OF MAGAZINE RACK IG 630 EX E300 X 3 9 09 18 09...
Страница 14: ...IG 630 EX E300 X 3 13 09 18 09...
Страница 15: ...IG 630 EX E300 X 3 14 09 18 09...